Hooking on For the Future

Tuesday, February 20, 2007
Lifeboat and Davit manufacturer Schat-Harding has re-engineered its range of on-load release hooks. The new hooks are designed to provide a safer solution. All Schat-Harding cruise tenders and lifeboats are already fitted with this new generation hook, complementing the second-generation hook designs fitted into the KISS and Freefall boat range. And from May 2007 all remaining types of boats leave the factory fitted with the new hooks.

The second generation of hooks has also been retrofitted for some owners, such as Celebrity Cruises.

Schat-Harding Freefall boats and KISS boats both have new hook designs based on the locked pipe system. In this system the tail of the hook is held in the locked position within a 3 - 5 cm deep steel pipe. It is clearly visible and can only be released by a 110 degree turn of the operating lever. Conventional davit-launched boats are now fitted with variants of Schat-Harding’s LHR hook range, based on a wearless cam system. The tail of the hook engages with the cam in the locking shaft when the shaft is in the locked position, and has 3 cm of contact area. When the on-load release is activated by rotating the locking shaft a roller in the tail of the hook contacts with the cam area, ensuring no need for tolerances and no wear on the assembly. This hook does not depend on close tolerances either during manufacture or use, and is also visibly safe because the open/close indicator is external and is integral to the locking shaft.

Maritime Reporter August 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

LNG

Korea Shipbuilder Wins US$400-M Greek Order

Daewoo Shipbuilding & Marine Engineering Co., South Korea’s second-largest shipbuilder, says it has signed a contract to build 4 tankships for Maran Tankers Management,

US DOE Approves Oregon LNG Export Project

The U.S. Energy Department said on Thursday it has approved Oregon LNG to export liquefied natural gas, as the Obama administration works through applications to

FERC Approves Freeport LNG Export Project

U.S. federal regulators on Wednesday approved construction of Freeport LNG Development LP's liquefied natural gas export project in Texas. Freeport is the third U.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Ship Repair Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0706 sec (14 req/sec)