Lapponian Reefer Docks at A&P Falmouth

Thursday, January 31, 2002
The Cayman Islands reefer vessel, Lapponian Reefer, has recently completed a nine day dry docking program where it underwent an extensive 10 year survey and repair work. The 11,095dwt vessel, owned by Holy House Shipping, dry docked on January 7, 2002 for works which included repairs of internal tank fractures, survey and repairs of sea valves, overhaul of the main engine, survey bearings and turbo charger overhaul. The gearbox was also opened and surveyed and the propeller blades were removed and surveyed. Other works included the removal and renewal of approximately 2,297 ft. of pipelines on the main decks, repairs of the main deck cranes and renewal of the hydraulics for the free-fall lifeboat.

Ship Repair & Conversion

Wärtsilä Re-gasification system for Norwegian Ship Conversion

Wärtsilä has been contracted to supply the re-gasification system for an FSRU (Floating, Storage, Re-gasification Unit) conversion project that Höegh LNG plans to carry out on a modern LNG vessel.

Royal IHC Upgrades TSHD Pump for Van Oord

Royal IHC informs it has completed the upgrade of the underwater pump and jet water system on trailing suction hopper dredger (TSHD) VOLVOX TERRANOVA for Van Oord.

Five Minutes with Paul Switzer

Five minutes with Paul Switzer - Manager, Shipbuilding & Offshore, Viega   For readers not familiar with Viega, please give a ‘birds eye’ view, putting the company

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Pipelines Port Authority Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0778 sec (13 req/sec)