Lebanon Plans for Floating LNG Plant

Thursday, February 23, 2006
Lebanon is planning to establish a floating Liquid Natural Gas (LNG) plant to feed natural gas directly to the country's power stations. Lebanon has been trying to adopt an alternative energy program for years, by diversifying its fuel sources and reducing its dependence on imported oil. With the government shouldering the mounting losses of ElectricitŽ du Liban - which meets Lebanon's annual energy consumption requirements using oil imports - the need to switch to switch to gas has become even more pressing. As part of the new energy strategy, Lebanon plans to build a natural gas pipeline along the coast to feed all its power plants. Up to 2004 the government did a lot of preparatory work to establish an off-shore national gas transmission pipeline from the North to the South. But the efforts were halted for political reasons. For gas supplies to be harnessed, The Natural Gas Master Plan and The Natural Gas Transmission Law, both of which have been sitting in the drawers of the government for years, need to be reactivated. An LNG plant will ensure security of future fuel supplies, which are increasingly vulnerable to instability in oil-producing countries. Imports of natural gas could be purchased from countries such as Egypt, Algeria and Qatar. (Source: International Herald Tribune)
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

LNG

Weak Oil Threatens US Export of LNG

Plunging global oil prices may turn hopes for cheap liquefied natural gas supplies from the United States into a costly disappointment for Asian buyers who have

Singapore’s MPA Discuss LNG Bunkering

The Maritime and Port Authority of Singapore (MPA), Antwerp Port Authority, Port of Rotterdam and Port of Zeebrugge participated in a Liquefied Natural Gas (LNG)

New Standard for LNG Cargo Containment Systems

Wilhelmsen Technical Solutions (WTS) said it has successfully completing the gas trial for the first LNG carrier built to a Boil Off Rate (BOR) of 0.08% per day.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Offshore Oil Port Authority Salvage Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1775 sec (6 req/sec)