LNG Regassification Terminal for Canaport

Tuesday, September 13, 2005
The initial phase of construction for the Canaport LNG project begins this week at Irving Canaport. Clearing of the site was completed in May 2005. The initial construction phase involves site excavation and leveling, and is the precursor to full-scale construction.

Front end engineering design for the project is now complete, and Canaport LNG issued a request for proposals for engineering, procurement and construction (EPC) earlier this summer. Onshore construction is scheduled to begin in Spring 2006.

Irving Oil Limited and Repsol YPF, S.A. announced in June that they had formed a new partnership, Canaport LNG, which will construct, own and operate the LNG regassification terminal in Saint John. The Canaport LNG terminal will be operational in 2008, initially delivering 1 billion cubic feet per day of regassified LNG into the market.

Email AddThis Feed Button Share
Maritime Reporter May 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ports

POLB Commissioners Elect Thomas Fields President

The Long Beach advertising executive & former city planning commissioner, will lead the commission for a 1-year term from 1, July 2013. Thomas Fields will succeed Commissioner Susan E.

ABB to Play Role in Protecting Venice

ABB’s Symphony Plus control system to help protect Venice from high water flooding at the long Venetian Lagoon Malamocco inlet. Every four years or so, text messages,

China Container Terminal Cargo Volumes Surge

Chongqing Container Terminal in Southwest China reports container volume up 29.7% to 166,000 teu in Q1 2013. Import and export container volume climbed 29.7 per cent to 166,000 TEU.

LNG

FSRU Toscana Sails Away From Drydocks World

Drydocks World said that Floating Storage Re-gasification Unit (FSRU) Toscana sailed away from Drydocks World – Dubai.    The unit, formerly the 138,830-cbm LNG carrier Golar Frost,

LNG Changeover Log-jam in N. American ECA

The IMO (International Maritime Organization) has chosen DNV to gather knowledge about the potential of LNG powered international shipping in the North American

Infrastructure for Alaska’s LNG and Other Resources

Trans Arctic Shipping Routes (TASR) It is time for the global maritime industry to push development of Trans Arctic Shipping Routes (TASR) and port facilities along Alaska’s northern coast.

 
 
mobi | rss feeds | archive | history | articles | privacy | contributors | top news | about us | copyright