Manitowoc Wins Harley Marine Contract

Wednesday, November 23, 2005
The Manitowoc Company, Inc. won a new construction contract from Harley Marine Services, Inc. to build an ocean-class, double-hull, hot oil tank barge. The 80,000-barrel capacity barge, which is scheduled for delivery in the fourth quarter of 2006, will measure 369 ft. (112 m) in length, 78 ft. (24 m) in width, and 33 ft. (10 m) in molded depth. The contract includes an option for a second identical vessel. The Harley barge is the tenth double-hull tank barge built by the Manitowoc Marine Group. The vessel features a flush deck design and is equipped with an onboard heating system to maintain consistent cargo temperatures of 160 degrees. It will also be ABS, U.S. Coast Guard, and OPA-90 compliant. Upon delivery, the barge will join a fleet of vessels to haul a variety of petroleum products, including #6 grade fuel oil, between Alaskan, Northwest, and West coast markets.
Email AddThis Feed Button Share
Maritime Reporter May 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Putin Urges Naval Shipbuilders to Expedite Deliveries

The United Shipbuilding Corporation (USC), is under criticism from Russian President Vladimir Putin for delays in delivery of several warships for the Russian Navy, RIA Novosti reported.

Colfax to Supply Pumps for Massive Heavy-lifting Ship

Colfax Fluid Handling, a business of Colfax Corporation, was awarded a contract as the exclusive supplier of hydraulic pumps for a ship capable of lifting the topside

Hermes Datacomms Wins Two-year African Support Contract

Hermes Datacommunications International Ltd., a company providing Wide Area Network communications to the upstream oil and gas industry, won a contract to support Tullow Oil plc.

 
 
mobi | rss feeds | archive | history | articles | privacy | contributors | top news | about us | copyright