Navy to Christen Experimental (X-Craft) Sea Fighter

Thursday, February 03, 2005
(Pictured is the Littoral Surface Craft – Experimental, "X-Craft," will be christened SEA FIGHTER (FSF-1) on 5 February 2005. The ceremony will take place at the Nichols Brothers Boatyard on Whidbey Island, Washington.)

The Navy will christen the experimental X-Craft "Sea Fighter" and designate it as the first Fast Sea Frame, Saturday, Feb. 5, during a noon PST ceremony at Nichols Bros. Boat Builders, Whidbey Island, Wash. Rep. Duncan Hunter, chairman of the House Armed Services Committee, will deliver the principal address. His wife, Lynne Hunter, is the ship's sponsor. In the time-honored Navy tradition, she will break a bottle of champagne across the bow to formally christen the ship "Sea Fighter."

The high-speed, experimental vessel will test a variety of technologies that will allow the Navy to operate more effectively in littoral, or near-shore, waters. Sea Fighter will be used to evaluate the hydrodynamic performance, structural behavior, mission flexibility, and propulsion system efficiency of high-speed vessels, and will also serve as a test bed for developmental mission packages. It will serve as a "risk reduction," experimental vessel for the Littoral Combat Ship and Coast Guard's Deepwater Program concept of operation development at sea.

The keel of the aluminum catamaran was laid in June 2003, is 262 feet in length and displaces 950 tons. The ship has a beam of 72 feet and a navigational draft of 11.5 feet. Two gas turbine engines, two propulsion diesels and two waterjets will power Sea Fighter to speeds reaching 50 knots.

The Sea Fighter's crew will consist of 16 Navy sailors and 10 Coast Guardsmen.

Maritime Reporter October 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

US Aircraft Carrier Crew Rescues Fishermen

Sailors and Marines aboard the U.S. Navy aircraft carrier USS Theodore Roosevelt (CVN 71) assisted two fishermen aboard a fishing vessel engulfed in flames off the east coast of Florida, Sept.

Austal Launches Trenton (JHSV 5)

Second Joint High Speed Vessel to be launched at Austal in 2014 On September 30, 2014, Austal USA successfully completed the launch process of Trenton (JHSV

Australia, US Order Anti-ship Missile Decoys

Design of the next generation of anti-ship missile decoys is set to commence following the signing of two contracts between the Australian Defense Force and BAE Systems Australia Pty Ltd.

 
 
Maritime Contracts Naval Architecture Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2640 sec (4 req/sec)