NSRP Portable Automated Bulkhead and Hull

Tuesday, December 22, 2009

The National Shipbuilding Research Program (NSRP) Portable Automated Bulkhead and Hull Straightener project has been completed with a final demonstration conducted at Northrop Grumman Shipbuilding – Gulf Coast in September 2009.

This project expanded upon a previous project, which focused on the plates. This effort broadened that concept by developing a straightening process for bulkheads and hull plates.

Current straightening methods have involved skilled workers who use a handheld torch and water hose. The technology developed for these projects involves thermal induction controlled through the use of laser sensors and software to ensure steel properties are not compromised while straightening the plate within Navy specifications.

The equipment is rugged, mobile, and fuel efficient with less fume and smoke output. Successful on-site testing in the shipyard demonstrated consistent straightening with significantly less coating damage, as well as considerable reduction in work time. Web-based training sessions at Northrop Grumman Shipbuilding -- Gulf Coast have been organized.

The Portable Automated Bulkhead and Hull Straightener is commercially available through N.A. Tech.

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Largest All-Electric Pipe Bender Starts Operations at Newport News Shipbuilding

Unison has commissioned what is believed to be the largest all-electric tube bending machine ever produced. The machine has started operations at Newport News Shipbuilding,

SeaZip Takes Delivery of Damen Crew Suppliers

On 28 March, SeaZip Offshore Service named two new Damen Fast Crew Suppliers (FCS) 2610 at Damen Shipyards Gorinchem.   The two vessels, named SeaZip 3 and SeaZip 4,

Damen Delivers Stan Patrol Vessel to RBDF

The Royal Bahamas Defence Force (RBDF) has taken delivery of the fourth and final Stan Patrol 4207, named HMBS Rolly Gray. The four Stan Patrol 4207s form part of the six-year Sandy Bottom project.

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Port Authority Ship Electronics Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1190 sec (8 req/sec)