NSRP Portable Automated Bulkhead and Hull

Tuesday, December 22, 2009

The National Shipbuilding Research Program (NSRP) Portable Automated Bulkhead and Hull Straightener project has been completed with a final demonstration conducted at Northrop Grumman Shipbuilding – Gulf Coast in September 2009.

This project expanded upon a previous project, which focused on the plates. This effort broadened that concept by developing a straightening process for bulkheads and hull plates.

Current straightening methods have involved skilled workers who use a handheld torch and water hose. The technology developed for these projects involves thermal induction controlled through the use of laser sensors and software to ensure steel properties are not compromised while straightening the plate within Navy specifications.

The equipment is rugged, mobile, and fuel efficient with less fume and smoke output. Successful on-site testing in the shipyard demonstrated consistent straightening with significantly less coating damage, as well as considerable reduction in work time. Web-based training sessions at Northrop Grumman Shipbuilding -- Gulf Coast have been organized.

The Portable Automated Bulkhead and Hull Straightener is commercially available through N.A. Tech.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter January 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Crowley Christens 2nd LNG-ready Product Tanker

Crowley christens second of four newly built, LNG-ready product tankers for use in U.S. coastwise trade   Crowley Maritime Corp. has christened the second of

VT Halter Delivers ATB Tug to Bouchard

VT Halter Marine, Inc. announced the delivery of the M/V Morton S. Bouchard Jr., the first of the two 6,000 horsepower Twin Screw Articulated Tug Barge (ATB) tugs to Bouchard Transportation Co.

Damen Builds Cable Installer For Maersk Supply Service

New Damen-built vessel for Maersk Supply Service to undertake long-term charter with DeepOcean   A newbuild DP2 cable installation vessel, Maersk Connector, was

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Offshore Oil Pod Propulsion Port Authority Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0759 sec (13 req/sec)