Oil and Gas Extraction at an Ocean Depth of 3,000 Meters

Friday, April 25, 2008

The family of offshore vessels also includes so-called offshore construction vessels. The latter are multi-purpose ships for the oil and gas industry used for the installation of ever more complex platforms and extraction systems, as well as for the laying of pipelines. OCVs are in service in all oceans of the world and equipped for long-term operation on the high seas. The OCV currently under construction can accommodate more than 120 crew members. For Voith Turbo Schneider Propulsion, the new vessel represents another engineering feat, because it is the largest and most powerful ship ever fitted with Voith Schneider Propellers (VSP) as main propulsion systems. Three VSP are installed in the stern, and two in the bow – all five of them type VSP 36R6 EC/280-2. The ship is driven by five electric motors with a total output of 19 000 kW – which corresponds to approximately 26 000 HP.   

The Norwegian owner North Sea Invest AS has placed the order with Astilleros Barrera in , to build the 145-meter long and 30-meter wide ship. Commissioning is scheduled for 2010. The OCV has two heave compensated cranes that adapt hydraulically to prevailing sea movements, as well as a helipad. During long-term duty on sea, boat and crew can therefore be supplied from the air.
Among the special features of the ship is a redundant dynamic positioning system (DP2) keeping the ship at a given working position, as well as the Voith Roll Stabilization (VRS), which reduces rolling motions when seas are high. Both devices enable the crew to work on board, even under bad weather conditions. The maximum sailing speed of the ship is 16 knots, which corresponds to almost 30 km/h.

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Diamond Offshore Shares on the Rise

Diamond Offshore Drilling Inc, one of the world's top five offshore rig contractors, reported a better-than-expected quarterly profit as it cut drilling costs and hiked prices,

Offshore O&G: Cuts, Delays in Norway as Costs Soar

More oil and gas projects in Norway could be put on hold because of rising costs, adding to a growing list of developments that have been delayed or called off,

Fincantieri Offshore Chooses AVEVA Software

One of the world’s largest shipbuilders uses AVEVA software to design next-generation drillship. Fincantieri Offshore has signed a contract with AVEVA to implement

 
 
Maritime Contracts Naval Architecture Navigation Pipelines Pod Propulsion Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0923 sec (11 req/sec)