Panama Canal Implements New Vessel Tracking System

Thursday, March 04, 2004
Beginning April 1, 2004, and to be fully implemented on July 1, 2004, the Panama Canal Authority (ACP) will begin using a new system to send and receive data to and from vessels planning to transit the Canal. Called the Automated Data Collection System (ADCS), the new system will eliminate the current process of data collection via paper, substituting it with an electronic exchange of information between the ACP and its customers. Vessels transiting the Canal will be required to report all necessary data 96 hours before arrival. To comply with the new security requirements included in the International Ship and Port Facility Security Code (ISPS), the ADCS will improve and facilitate the process of data submission needed for risk assessments and transit operations. The ADCS should save time, lessen human error and reduce delays. The ADCS is one of the many projects within the permanent modernization program that the ACP is currently implementing to enhance the efficiency and reliability of the Canal, while ensuring the safety of its customers.
Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ports

Tanker Backlog Builds at Basra

Ships face up to a three week wait; bad weather in February delayed loading, created backlog. * April intake to be reduced to clear backlog By Keith Wallis SINGAPORE,

U.S. Port Delay Boost February Air Freight

Global air freight volumes rose 11.7 percent year-on-year in February, driven by the Chinese New Year, the International Air Transport Association said on Wednesday.

Largest Vessel to Call ICTSI, Rijeka

Adriatic Gate Container Terminal (AGCT), International Container Terminal Services, Inc.’s (ICTSI) container handling facility in the Port of Rijeka, Croatia, recently

Navigation

Power Cut in Turkey Disrupts Port Operations

Port operations in Turkey are facing disruption as a result of a massive power cut that has hit dozens of provinces across the country today (Tuesday 31 March).

USCG Rescues 9 from Canadian Tall Ship

Coast Guard search and rescue crews from Station Gloucester, Air Station Cape Cod and the Coast Guard Cutter Ocracoke rescued nine crewmembers from the Canadian

Great Lakes Losing Ice

The Great Lakes Environmental Research Laboratory reports ice cover for all of the Great Lakes combined at around 52%, thanks to milder temperatures and gusty winds over the past several weeks.

 
 
Maritime Contracts Maritime Standards Naval Architecture Offshore Oil Pod Propulsion Port Authority Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1012 sec (10 req/sec)