Philippine Govt Seeks Expansion of RoRo Facility

Tuesday, January 16, 2007
The Philippine government seeks to boost the fleet of RoRo vessels to cover unserved routes throughout the country, according to the Maritime Industry Authority. Emerson Lorenzo, head of Marina’s Shipping Regulation Office,said that 30 RoRo ships are needed for unserviced routes nationwide. Each RoRo with a capacity of 500 gross tons costs $4 to $6m. Lorenzo said the additional RoRo vessels would improve the country’s cargo industry and strengthen the Central and Eastern Nautical Highways.

Under the program, the government wants a RoRo port system to link the country’s islands. Another trigger for increased demand in new vessels is the April 2008 deadline for the phase-out of black cargo tankers plying Philippine waters. Each vessel, carrying 2,500 to 3,750 dead-weight tons, is priced at around $10m to $15m. Lorenzo said that local shipyards have no technology to build such vessels, but many are establishing ties with foreign shipyards to cope with demand. The average life span of a sea-going vessel is 30 to 35 years, with classed ships able to operate well beyond 50 years. Unclassed ships, however, are considered old by the time they reach 25. Source: The Manila Times

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Wagenbourg New Crane for Oil, Gas, Energy Sector

Wagenborg Nedlift has expanded her crane fleet with a brand new 700 tonnes mobile crane. With this crane the fleet is significantly strengthened. Equipped with

Study: An Arctic Oil Well Blowout Could Spread More Than 1,000km

Oil from a spill or oil well blowout in the Arctic waters of Canada's Beaufort Sea could easily become trapped in sea ice and potentially spread more than 1,000 kilometres to the west coast of Alaska,

Westermeerwind Wind Farm Construction Begins

Mammoet announced today that Westermeerwind BV has reached financial close on July 25 for the turnkey construction of the Westermeerwind wind farm in Ijsselmeer,

RoRo

MES Gets First Order for ME-GI Marine Engine

Mitsui Engineering & Shipbuilding Co., Ltd. (MES) has received the first order of electronically controlled gas injection diesel engine (ME-GI) for MES. MAN B&W 8S70ME-C8.

Peel Ports Enters 10-year Deal with Volkswagen

Peel Ports Medway signs 10-year deal with Volkswagen Group UK; new multimillion pound facility will generate 100 new jobs and add more than 50,000 car imports Peel

Trailer Bridge Vessel Returns to Service

Following required regulatory inspections along with regular scheduled maintenance in Mobile, Alabama, the Trailer Bridge Ro/Ro vessel the Jax - San Juan Bridge (JSB) returned to service on July 5.

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Offshore Oil Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0708 sec (14 req/sec)