Possible Delay in Chevron’s Delta LNG Production

Wednesday, November 09, 2005
According to a report in the Caracas Daily Journal, Chevron has found enough natural gas in Venezuela’s Orinoco Delta platform to warrant the country’s first LNG train. But Venezuela’s lacking gas infrastructure and indecisive construction plans have led some in the industry to wonder if Chevron will be forced to delay production. The Delta platform license issued by the energy ministry to Chevron last year stated that the company could submit a proposal to build pipe-lines from its fields to the planned CIGMA liquefied gas plant in the Paria Peninsula. But the government appeared to change its mind when state-run Petroleos de Venezuela (PDVSA) announced in August that it intended to build the pipelines by itself. The decision could delay production schedules for Chevron -- which has licenses for blocks 2 and 3 -- and for Norway’s Statoil -- which has a license for block 4. It could also postpone PDVSA’s goal to begin LNG exports by 2010. Source: Caracas Daily Journal
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Propulsion

B COOL Acquires MEMAC

With the acquisition of MEMAC, B COOL A/S now offers customers one entry to multiple maritime systems – both refrigeration solutions and monitoring of the engine

Mitsubishi Super Skiving System

Mitsubishi Heavy Industries, Ltd. (MHI) has completed development of the "Mitsubishi Super Skiving System" for machining internal gears with high speed and outstanding precision.

Mitsubishi: First-Ever Licensing Deal to Chinese for Marine Propellers

Mitsubishi Heavy Industries Marine Machinery & Engine Co., Ltd. (MHI-MME), a group company of Mitsubishi Heavy Industries, Ltd. (MHI),  concluded a licensing agreement

LNG

Weak Oil Threatens US Export of LNG

Plunging global oil prices may turn hopes for cheap liquefied natural gas supplies from the United States into a costly disappointment for Asian buyers who have

Singapore’s MPA Discuss LNG Bunkering

The Maritime and Port Authority of Singapore (MPA), Antwerp Port Authority, Port of Rotterdam and Port of Zeebrugge participated in a Liquefied Natural Gas (LNG)

New Standard for LNG Cargo Containment Systems

Wilhelmsen Technical Solutions (WTS) said it has successfully completing the gas trial for the first LNG carrier built to a Boil Off Rate (BOR) of 0.08% per day.

 
 
Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Salvage Ship Electronics Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1050 sec (10 req/sec)