RFA Sir Percivale Awarded to A&P Tyne

Thursday, July 03, 2003
A&P Tyne has been awarded the latest fleet auxiliary refit contract in the form of the drydocking and repair of the fleet support vessel RFA Sir Percivale, by the UK Ministry of Defence (MoD). The vessel, which is operated by the Warship Support Agency (WSA), is due to arrive on Tyneside on 7 July 2003 for a extended survey and repair period scheduled to last four weeks. Work involved will include docking hull preparation and painting, voyage repairs, hull surveys, cargo access equipment survey, safety equipment survey, freeboard survey, main and auxiliary engine survey, accommodation upgrade and refurbishment work, and minor alterations and additions to ships systems.
Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ship Repair & Conversion

Damen to Refit Helix Well Intervention Vessel

After having docked and repaired the MSV Seawell in 2012 and DSV Well Enhancer earlier this year, Damen Shiprepair Vlissingen (DSV) was contracted by Helix UK to

Damen, Palfinger Upgrade North Sea Jack-Up Rig

With the support of Palfinger systems JUMP technology, Damen Shiprepair Vlissingen has completed an upgrade of a Keppel Fels ‘N’ Class drilling rig, one of the largest in the North Sea,

Dutch Yards May Need to Rethink Contract Structures

Rotterdam-based law firm AKD said a recent decision of the Dutch courts means that shipyards in The Netherlands may no longer be able to rely on the right to retain

Ports

Vacant Pier to Help Ease Long Beach Congestion

Pier S temporary depot to relocate empty containers for next five months    The Port of Long Beach expects a “Temporary Empty Container Depot” planned for a vacant

Vietnam Warship Visits Underscore Regional Tension

Vietnam on Tuesday showed off its two most powerful warships in the first-ever port call to the Philippines but an official said it was not trying to challenge

Vacant Pier at Long Beach Port to Ease Congestion

The Port of Long Beach expects a “Temporary Empty Container Depot” planned for a vacant pier on Terminal Island to be open and operating in December, which will

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Naval Architecture Navigation Pipelines Pod Propulsion Salvage Ship Electronics Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0988 sec (10 req/sec)