Brazillian Built PSV Delivered

Thursday, February 16, 2012
Photos: Estaleiro Alianca
The platform supply vessel (PSV) ‘CBO Atlântico’ was recently delivered, the first of six ULSTEIN designed X-BOW vessels to be built in Brazil, and the very first of the PX106 design. The vessel was constructed at Estaleiro Alianca shipyard in Rio de Janeiro, Brazil, for shipowner CBO (Companhia Brasileira de Offshore). CBO has already two PSVs of P106 design from ULSTEIN in its fleet.
When CBO in 2010 and 2011 decided to order ULSTEIN designed PSVs for Petrobras’ oil rigs support activities outside Brazil, their demands were such: The ships had to adapt to more and more complex operations and bring with them new technologies to provide quality services, ensure safety and protect sensitive marine environments. Their final decision was to order two small vessels (PX106) and four large vessels (PX105). The vessels comply with Petrobras’ PSV3000 and PSV4500 tenders, and are designed for effective and flexible transportation of bulk and general cargo to installations offshore. The contracts include delivery of design, engineering, main equipment and commissioning follow-up.
‘CBO Atlântico’ measures 76.3 m (length overall) by 16 m (breadth), and the depth to main deck is 7.5 m. The cargo deck area is 660 m2. Three of the tanks are multitanks of the Cargomax system. She has diesel electric propulsion and azimuth propellers, and can keep a speed of approximately 15 knots. ‘CBO Atlântico’ complies with the CLEAN notation from Det Norske Veritas.
"The cooperation with both Estaleiro Alianca and CBO has been extremely well. We are very pleased with the finish and quality of the end product," says Project Manager at ULSTEIN, Mr. Rolf Olsen Husø.
The second PX106 is to be delivered later this year (Q2), and four PSVs of PX105 design will be delivered during 2012–2013.
Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

When Will Deep Sea Mining Commence? The Robot is Ready

The world's first deep sea mining robot sits idle on a British factory floor, waiting to claw up high grade copper and gold from the seabed off Papua New Guinea

Havyard to Build Hybrid Battery Arctic PSV

Norway's Havyard says it has signed a contract for the construction of a Havyard 833 WE ICE platform supply vessel with Fafnir Offshore HF. The vessel is to be

Offshore Service Vessels Design Innovation

It could be argued that no other sector of the maritime market has experienced a design innovation revolution quite like the Offshore Service Vessel (OSV) market.

Shipbuilding

Reports: Brazilian Tycoon Batista Investigated For Financial Crimes

Brazils federal police have opened an investigation into former billionaire Eike Batista for financial crimes, including insider trading, manipulation of markets and money laundering,

Shipping Turns From Banks to Equity Markets for Cash

Shipping companies are turning to equity markets to fill a growing funding gap, betting that investors hungry for decent returns will provide capital to a sector

Keel-Laid for Navy's 10th LCS at Austal Yard

The Navy and Austal USA held a keel-laying ceremony for the future 'USS Gabrielle Giffords', the Navy's 10th littoral combat ship (LCS), in Mobile, Ala., informs

Offshore

Shell Commited To Russia Expansion Despite Sanctions

Royal Dutch Shell is committed to expansion in Russia, Chief Executive Ben van Beurden told Russian President Vladimir Putin at a meeting on Friday amid sanctions

Russia Ships First Oil From Offshore Arctic Platform

President Vladimir Putin hailed Russia's first shipment of Arctic offshore oil on Friday, saying the platform decried by environmentalists will help Moscow expand its global energy markets share.

When Will Deep Sea Mining Commence? The Robot is Ready

The world's first deep sea mining robot sits idle on a British factory floor, waiting to claw up high grade copper and gold from the seabed off Papua New Guinea

Naval Architecture

Havyard to Build Hybrid Battery Arctic PSV

Norway's Havyard says it has signed a contract for the construction of a Havyard 833 WE ICE platform supply vessel with Fafnir Offshore HF. The vessel is to be

Two Marine Engineers Join Specialists EBDG

Naval architecture, marine engineering & production support service providers Elliott Bay Design Group LLC (EBDG) apprise that they have appointed marine engineers

TEPNG Integrates AVEVA Engineering & Design

AVEVA announced that TOTAL E&P Nigeria Ltd. (TEPNG) has adopted AVEVA’s Engineering & Design solutions as part of an Integrated Engineering & Design approach. TEPNG

Vessels

Havyard to Build Hybrid Battery Arctic PSV

Norway's Havyard says it has signed a contract for the construction of a Havyard 833 WE ICE platform supply vessel with Fafnir Offshore HF. The vessel is to be

Rotterdam port's throughput almost stable

The Port of Rotterdam’s throughput in the first quarter of 2014, at 109 million tonnes, was 0.2% below the level for the corresponding period last year.Split up by goods type,

Divers struggle in search for ferry survivors

Rescuers struggled with strong waves and murky waters on Thursday as they searched for hundreds of people, most of them teenagers from the same school, still missing

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Navigation Pipelines Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1369 sec (7 req/sec)