Cruise Ships Smarten Up in Bremerhaven

Press Release
Thursday, November 22, 2012
'Braemar' & 'Balmoral': Photo credit Lloyd Werft Bremerhaven AG

Three big cruise ships visit Lloyd Werft Bremerhaven AG in the coming days and weeks to be spruced up for the 2013 cruise season.

The ships are the MS "Braemar" and the MS "Balmoral", belonging to new customer Fred Olsen Cruise Lines, and Saga Shipping Corporation’s MS "Saga Ruby", better known previously to the yard as Cunard’s "Caronia".

In the meantime Cunard’s 294 m long, 90,049 gt cruise ship "Queen Victoria" has returned to passenger service. That came after the original contract was extended to include the additional installation of a new type of exhaust gas cleaning plant or scrubber. It was the first such installation ever carried out by Lloyd Werft on a cruise ship.

Another first was the docking at Lloyd Werft of the 196 m long, 24,344 gt MS "Braemar and the acquisition of her owner Fred Olsen Cruise Lines as a new customer. The ship was docked up to November 21st for extensive maintenance and repair including the complete overhaul of her stabilisers and the removal of both rudders. The funnel deck on the cruise ship, built in Valencia in 1993, was also being doubled in size. Work was carried out on the ship’s piping system and steel works were also undertaken.

The 191 m long and 24,492 gt MS "Saga Ruby" docked in Lloyd Werft’s big Kaiser Dock on November 15th.  Saga Shipping Corporation, a subsidiary of the English insurance concern Acromas Holidays, bought the cruise liner in 2004. "Saga Ruby", built in 1973, made a name for herself as the dream cruise ship "Vistafjord" and was for two years the main participant in the first of a series of popular German TV shows of that name.


Maritime Reporter September 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


Sea Truck's DP3 Construction Ship Passes Sea Trials

Sea Trucks has completed sea trials of the DP3 offshore construction vessel Jascon 18 in Singapore. Jascon 18 features a 1,800-metric-ton crane, 1,800 sq m deck and a 750-metric-ton pipelay system.

Royal Thai Navy Orders Harbor Tug

The Royal Thai Navy has ordered a new 32-meter tug from shipbuilder Italthai Marine Limited of Thailand, announced the vessel’s designer, Robert Allan Ltd.   Italthai Marine,

Eni Arctic Service Rig Extension Okayed

Italian oil company Eni has received permission from Norway's Petroleum Safety Authority to extend the use of a service rig on its troubled Arctic Goliat oil field offshore Norway until Nov.

Ship Repair & Conversion

ECDIS Ordered for 20 Indonesia Surveillance Vessels

Transas ECDIS has been selected for installation on board 20 surveillance vessels under operation of the Directorate General of Marine Resources and Fisheries Surveillance,

Towering Damen Marine Components Hits 150‏

Damen Marine Components (DMC), the oldest company in Damen Shipyards Group, celebrates its 150th anniversary today. DMC has grown from a very small shipyard established in Gorinchem in 1865,

MARAD Backs Emissions Reduction Projects

The U.S. Department of Transportation’s Maritime Administration (MARAD) announced it will provide more than $1 million to support the development of two new emission-reducing maritime solutions.

Maritime Careers / Shipboard Positions Naval Architecture Navigation Pipelines Pod Propulsion Port Authority Ship Electronics Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1972 sec (5 req/sec)