Cruise Ships Smarten Up in Bremerhaven

Press Release
Thursday, November 22, 2012
'Braemar' & 'Balmoral': Photo credit Lloyd Werft Bremerhaven AG

Three big cruise ships visit Lloyd Werft Bremerhaven AG in the coming days and weeks to be spruced up for the 2013 cruise season.

The ships are the MS "Braemar" and the MS "Balmoral", belonging to new customer Fred Olsen Cruise Lines, and Saga Shipping Corporation’s MS "Saga Ruby", better known previously to the yard as Cunard’s "Caronia".

In the meantime Cunard’s 294 m long, 90,049 gt cruise ship "Queen Victoria" has returned to passenger service. That came after the original contract was extended to include the additional installation of a new type of exhaust gas cleaning plant or scrubber. It was the first such installation ever carried out by Lloyd Werft on a cruise ship.

Another first was the docking at Lloyd Werft of the 196 m long, 24,344 gt MS "Braemar and the acquisition of her owner Fred Olsen Cruise Lines as a new customer. The ship was docked up to November 21st for extensive maintenance and repair including the complete overhaul of her stabilisers and the removal of both rudders. The funnel deck on the cruise ship, built in Valencia in 1993, was also being doubled in size. Work was carried out on the ship’s piping system and steel works were also undertaken.

The 191 m long and 24,492 gt MS "Saga Ruby" docked in Lloyd Werft’s big Kaiser Dock on November 15th.  Saga Shipping Corporation, a subsidiary of the English insurance concern Acromas Holidays, bought the cruise liner in 2004. "Saga Ruby", built in 1973, made a name for herself as the dream cruise ship "Vistafjord" and was for two years the main participant in the first of a series of popular German TV shows of that name.

 

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Shipping Turns From Banks to Equity Markets for Cash

Shipping companies are turning to equity markets to fill a growing funding gap, betting that investors hungry for decent returns will provide capital to a sector

Keel-Laid for Navy's 10th LCS at Austal Yard

The Navy and Austal USA held a keel-laying ceremony for the future 'USS Gabrielle Giffords', the Navy's 10th littoral combat ship (LCS), in Mobile, Ala., informs

Havyard to Build Hybrid Battery Arctic PSV

Norway's Havyard says it has signed a contract for the construction of a Havyard 833 WE ICE platform supply vessel with Fafnir Offshore HF. The vessel is to be

Ship Repair & Conversion

Crewman Claims Ferry Captain "Rushed Back To Bridge"

The captain of a South Korean ferry that capsized two days ago rushed back to the bridge after it started listing severely and tried in vain to right the vessel,

TEPNG Integrates AVEVA Engineering & Design

AVEVA announced that TOTAL E&P Nigeria Ltd. (TEPNG) has adopted AVEVA’s Engineering & Design solutions as part of an Integrated Engineering & Design approach. TEPNG

ClassNK Approves Fillet Welding Consumable

Classification society ClassNK announced that it has granted type approval for the new MX-200F welding consumable, developed by Kobe Steel Co., Ltd. (KOBELCO) to

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Navigation Port Authority Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1906 sec (5 req/sec)