Cruise Ships Smarten Up in Bremerhaven

Press Release
Thursday, November 22, 2012
'Braemar' & 'Balmoral': Photo credit Lloyd Werft Bremerhaven AG

Three big cruise ships visit Lloyd Werft Bremerhaven AG in the coming days and weeks to be spruced up for the 2013 cruise season.

The ships are the MS "Braemar" and the MS "Balmoral", belonging to new customer Fred Olsen Cruise Lines, and Saga Shipping Corporation’s MS "Saga Ruby", better known previously to the yard as Cunard’s "Caronia".

In the meantime Cunard’s 294 m long, 90,049 gt cruise ship "Queen Victoria" has returned to passenger service. That came after the original contract was extended to include the additional installation of a new type of exhaust gas cleaning plant or scrubber. It was the first such installation ever carried out by Lloyd Werft on a cruise ship.

Another first was the docking at Lloyd Werft of the 196 m long, 24,344 gt MS "Braemar and the acquisition of her owner Fred Olsen Cruise Lines as a new customer. The ship was docked up to November 21st for extensive maintenance and repair including the complete overhaul of her stabilisers and the removal of both rudders. The funnel deck on the cruise ship, built in Valencia in 1993, was also being doubled in size. Work was carried out on the ship’s piping system and steel works were also undertaken.

The 191 m long and 24,492 gt MS "Saga Ruby" docked in Lloyd Werft’s big Kaiser Dock on November 15th.  Saga Shipping Corporation, a subsidiary of the English insurance concern Acromas Holidays, bought the cruise liner in 2004. "Saga Ruby", built in 1973, made a name for herself as the dream cruise ship "Vistafjord" and was for two years the main participant in the first of a series of popular German TV shows of that name.

 

Maritime Reporter November 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Wärtsilä to Begin Building LNG Terminal in January

Wärtsilä has been given full notice to proceed (NTP) from Manga LNG Oy for the supply of a liquefied natural gas (LNG) import terminal in Tornio, Northern Finland.

Polarcus Awarded 3D Project Off West Africa

Polarcus Limited has signed a letter of intent with Perenco Oil & Gas Gabon S.A. for a 3D marine seismic acquisition project offshore West Africa.   The project,

Boskalis, VolkerWessels Win Offshore Wind Farm Work

Royal Boskalis Westminster N.V., in partnership with Volker Stevin International (VolkerWessels), has been awarded a contract by Iberdrola Renewables Offshore Deutschland

Ship Repair & Conversion

Keeping to the Schedule in the Pacific Northwest

When a tightly scheduled repower for the Kodiak-based trawler Sea Mac in early December took a very bad turn, Mike Fourtner used his 25 years of fishing experience

Optimarin ,Goltens Ink BWT Retrofit Agreement

Ballast Water Treatment (BWT) specialist Optimarin and Goltens, a provider of engineering and installation solutions for the shipping industry, have signed a nonexclusive

China's Scrap Yards Apply for EU Regulation

China's Zhoushan Changhong International Ship Recycling and Jiang Xiagang Changjiang Ship Recycling Yard, world’s two biggest ship scrap yards by capacity,  have

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Offshore Oil Pod Propulsion Port Authority Salvage Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1494 sec (7 req/sec)