First of Type DP2 IMO 70m Catamaran FCB Under Construction

MarineLink.com
Tuesday, September 10, 2013
Photo: Incat Crowther

Incat Crowther announced a first of type 70m Catamaran Fast Crew Boat (FCB), compliant with IMO HSC code and complete with a crew transfer system consisting of dynamic positioning equipment class (DP2) coupled with a stabilized access platform. Construction of the vessel has commenced at the shipbuilder Incat Tasmania, with delivery scheduled for September 2014.

The vessel will operate as a fast crew transfer vessel for 150 offshore workers to multiple offshore installations. The hull design has been optimized for high speed transits with specific features to limit the sea sickness of transiting offshore workers. The onboard noise, vibration and indoor climate is in accordance with DNV comfort class notation. The vessel is designed to operate in sea conditions of 40 knot wind and seas of 3m significant wave height.

The high speed of the 70m FCB allows operational cost efficiency over helicopter transfer for passengers and cargo, whilst the advanced design ensures the crew arrives at the platform fit for work.

Crew transfer is completed primarily by a stabilized access platform, providing a level platform and gangway to access the offshore platform from the vessel. The access platform compensates for the vessels motion by using six hydraulic cylinders. The vessel will hold station using dynamic positioning (DNV DYNPOS-AUTR), and in combination with the stabilized access platform, crew transfers will be performed in up to sea state 4.

This vessel is the first catamaran to utilize this system and the first to have the stabilized access platform structure and supporting systems integrated into the design. For redundancy and operations in higher sea conditions, a crane lifted personnel transfer system is provided for up to two groups of nine offshore workers.

Whilst the primary function of the vessel is crew transfer, the vessels arrangement provides flexibility with over 100 square meters of cargo deck, rated at 2t/m2. This capacity will allow the vessel to complete cargo hot shots for up to 110 metric tons of specialized equipment to a range of 300nm at speeds up to 35 knots.

The vessel is under construction at the Incat Tasmania shipyard, with the design by Incat Crowther and production engineering by Revolution Design. The final product incorporates key experience and strengths by each of the parties involved. Incat Tasmania has the specialized facilities, construction methodologies and experience of very large aluminum catamarans. Revolution Design has incorporated the production engineering design techniques optimized over multiple build projects at Incat Tasmania.

The shipyard’s construction capability and capacity has leveraged into this market with the oil and gas design experience of Incat Crowther; utilizing the track record obtained from the design of the SEACOR CrewZer class fast catamaran crew boats. This class of vessel dates back to 2007, with the first of class vessel SEACOR Cheetah. The latest vessel in this class, SEACOR Leopard, has just completed sea trials in the US. Incat Crowther has over 90 vessels operating or under construction for the world-wide oil and gas market, which includes eight Incat Crowther-designed crew boats currently operating in the Caspian Sea.

The high level of passenger comfort on the 70m FCB will be achieved by the vessel’s advanced semi-SWATH hull form, combined with a resiliently mounted main cabin and superstructure and active ride control system consisting of T-Foil, interceptors and yaw stabilizers.

Passengers are accommodated on both the main deck and mid-deck, with the mid-deck featuring crew accommodation for 14. All crew cabins are ILO-compliant. The main deck also features VIP rooms, vending machines, luggage space and a large workshop.

The aft cargo deck measures in excess of 400 square meters; housing the stabilized access platform, dedicated landing area for the crane lifted personnel transfer system, as well as 10’ luggage containers and hot shot cargo area.

Four MTU 16V4000 engines will power the vessel driving Hamilton HT-900 water jet propulsion with a service speed of 30 knots at full load condition and 90% MCR in sea state 4. Four azimuthing drop-down thrusters forward will take care of maneuvering, with the vessel having DP-2 equivalent DNV classification.

Safety of operation and environmental protection is a high priority; subsequently the environmental impact of the vessel’s emissions to air, discharges to sea, deliveries to shore from the vessel and protection against accidents are controlled and designed in accordance with environmental class. The safety of vessels operation is prioritized by the bridge design and navigational equipment compliance with nautical safety class.

The new crew transfer vessels will be delivered to Caspian Marine Services Ltd (CMS) in Baku, Azerbaijan, via a transit through the Volga-Don Canal. Once deployed, CMS will operate the vessels, providing crew transfer and hot shot cargo services to platforms in such fields as Azeri-Chirag-Deepwater Gunashli (ACG), the largest oil field in Azerbaijan sector of the Caspian Sea and Shah Deniz (a large offshore gas and condensate field). The oil and gas produced from these fields is transported by tanker for processing in Baku, and then transported via pipeline through Georgia and Turkey to the Mediterranean port of Ceyhan or the Georgian port of Supsa in the Black Sea.

Principal Dimensions

Length Overall - 229’ 8” / 70m
Length Waterline - 221’ 10” / 67.6m
Beam Overall - 52’ 6” / 16m
Draft (hull) - 6’ 7” / 2m
Depth - 19’ 9” / 6m
Construction - Marine grade aluminum

Capacities

Fuel Oil – 13,209 gallons / 50,000 liters
Fresh Water – 2,642 gallons / 10,000 liters
Grey Water - 793 gallons / 3,000 liters
Sullage - 793 gallons / 3,000 liters
Personnel - 150
Crew - 14

Propulsion and Performance

Speed (Service) - 30 knots
Speed (Max) - 36 knots
Main Engines - Four MTU 16V4000 M73L
Power – Four 2,880kW at 2,050rpm
Propulsion - Two Hamilton HT-900 S Water jets
Generators - Four 550 ekW
Bow Thrusters - Four 300hp azimuth retractable

Special Equipment
Dynamic Positioning - DNV DYNPOS-AUTR R Control system
Crew Transfer Systems - Ampelmann Stabilised Access Platform, Frog-9 Crane Lifted Rigid Basket
Safety Equipment - 12 Person Rescue Boat, Six Person MOB Boat, Two 200 Pax Liferafts and Two 100 Pax MES

Regulatory

Flag - Azerbaijan
Class/Survey - +1A1 DNV HSLC Service 2, R1, EO, DYNPOS-AUTR, CLEAN-DESIGN, COMF-V(3) C(3), NAUT-HSC, NAUT-OSV(A), IMO DP Equipment Class 2

incatcrowther.com

  • Photo: Incat Crowther

    Photo: Incat Crowther

  • Photo: Incat Crowther

    Photo: Incat Crowther

  • Photo: Incat Crowther

    Photo: Incat Crowther

  • Photo: Incat Crowther
  • Photo: Incat Crowther
  • Photo: Incat Crowther
Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

FORAN Users Meeting (FORUM 2014)

The Eighth FORAN Users Meeting (FORUM 2014) took place June 11-13, 2014 in the Parador de la Granja, Segovia, and when it was over the organizers proclaimed it a great success,

MAN Extends High Speed Power Range

MAN announced it will present a newly developed 12-cylinder V-engine for use in working vessels at the SMM 2014 trade fair in Hamburg, Germany. The German engine

Scorpio Bulkers Gets $540m Loan for Newbuilds

Scorpio Bulkers Inc. announced that it has received a commitment for a $540 million loan facility and provides an update on the financing of its fleet. On July 21,

Marine Power

Harnessing the Wind for Auxiliary Propulsion

Finnish marine engineering company Norsepower Oy Ltd. announced that it will bring to the commercial maritime market an auxiliary wind propulsion solution aimed

MAN Extends High Speed Power Range

MAN announced it will present a newly developed 12-cylinder V-engine for use in working vessels at the SMM 2014 trade fair in Hamburg, Germany. The German engine

Engine Performs in Roll Over Test

Engines customized for new Dutch search-and-rescue lifeboat vessels keep running after full rotation on axis. In thrashing, unforgiving seas, a capsized rescue vessel used to be a symbol of defeat.

Naval Architecture

FORAN Users Meeting (FORUM 2014)

The Eighth FORAN Users Meeting (FORUM 2014) took place June 11-13, 2014 in the Parador de la Granja, Segovia, and when it was over the organizers proclaimed it a great success,

Third RAmparts 2500 Tug for SMIT-Rebras

Keppel Singmarine BrasilLtda. (KSMB), of Navegantes, Brazil has recently completed the construction of the SMIT Panará, the third of a series of six Robert Allan Ltd.

IACS Formal Safety Assessment (FSA) Training Course

The International Association of Classification Societies (IACS) says that to  facilitate a wider understanding of the Formal Safety Assessment (FSA) process, its

News

Maine Port City Bans Oil Loading

City councilors in South Portland, Maine, voted late Monday night to ban the loading of crude oil onto tankers along its waterfront, throwing up yet another roadblock

Klüber Obtains Certification for Manufacturing Facilities

Klϋber Lubrication has received the National Sanitation Foundation (NSF) ISO 21469 certification at its Londonderry, New Hampshire facility. The certification from

Pier Damaged at Port Canaveral

Undergoing Repairs While Coast Guard Investigates   The U.S. Coast Guard is investigating a weekend incident that caused pier damage and scattered concrete debris in the harbor on Sunday.

Vessels

Engine Performs in Roll Over Test

Engines customized for new Dutch search-and-rescue lifeboat vessels keep running after full rotation on axis. In thrashing, unforgiving seas, a capsized rescue vessel used to be a symbol of defeat.

Third RAmparts 2500 Tug for SMIT-Rebras

Keppel Singmarine BrasilLtda. (KSMB), of Navegantes, Brazil has recently completed the construction of the SMIT Panará, the third of a series of six Robert Allan Ltd.

Russia Doubts France Will Cancel Warships Sale

A senior Russian official said on Monday he doubted France would cancel its sale of warships to Russia, despite coming under pressure from other Western leaders

Dynamic Positioning

Stanford Secures Long Term PSV Charter in Mexico

Stanford Marine announced today from its Dubai headquarters that it has secured a three-year contract for one of its 87-meter Platform Supply Vessels (PSV), Stanford Bateleur, in Mexico.

Kongsberg Tech Chosen for 13 Newbuild Projects

Kongsberg Maritime’s Full Picture solution has been selected by Chinese and Korean shipbuilders for 13 advanced newbuild offshore vessels with a total value of 330 MNOK.

FURUNO and Electronic Navigation Join Forces

Electronic Navigation Ltd (ENL), New Zealand’s largest marine electronics company and the developer of the WASSP sonar, and FURUNO Electric Co., Ltd of Japan, a

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2311 sec (4 req/sec)