Great Lakes Shipyard Contracted for USCG Cutter Repairs

MarineLink.com
Monday, May 13, 2013
Coast Guard Cutter Neah Bay (photo: Great Lakes Shipyard)

Great Lakes Shipyard hauled out the United States Coast Guard Cutter Neah Bay (WTGB-105) using its 770-ton capacity Travelift. The repair contract, awarded to the Shipyard in early March, includes routine drydocking and underwater hull maintenance such as inspection and testing of propulsion systems; overhaul of sea valves and shaft seal assemblies; and other various cleaning, inspections, and repairs.

This is the first of the USCG’s nine 140-foot Bay Class ice breaking tugs to be drydocked using Great Lakes Shipyard’s new Marine Travelift. The Traveliftis are the largest on the Great Lakes in the United States and Canada, second largest in the Western Hemisphere and third largest in the world. It was specifically designed and sized for Great Lakes Shipyard to accommodate the Bay Class Coast Guard Cutters and other vessels.

Work on the NEAH BAY is to be completed by late June.

Great Lakes Shipyard is a full-service yard specializing in new construction, fabrication and repairs of all types of vessels and barges.

www.thegreatlakesgroup.com

 

Maritime Reporter August 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ship Repair & Conversion

Fugro Achieves Innovation through Integration

When Aberdeen-based Diamond Offshore wanted to add new functionality to the existing helideck monitoring system on the Ocean Guardian drilling rig in the North Sea,

Refurbished Seajacks Vessels Leave Shipdock Amsterdam

Seajacks Leviathan and Seajacks Kraken are prepared for their coming assignments, following a series of repair and renewal jobs by Shipdock Amsterdam. The shipyard,

BAE Systems Awarded Two Navy Contract Modifications

The US Department of Defense informs it has awarded separate contracts to BAE Systems in Jacksonville and in Norfolk for ship repairs and modifications as follows: 1.

Coast Guard

Scientific Team Arctic-bound Aboard Cutter 'Healy'

A team of scientists from the Coast Guard Research and Development Center (RDC) is to depart shortly from Seward, Alaska, for a technology evaluation in the Arctic

USCG Cutter Waesche Home from RIMPAC Exercises

The Coast Guard Cutter Waesche has returned to port at Coast Guard Base Honolulu, after spending three weeks at sea participating in Rim of the Pacific (RIMPAC) 2014 exercises,

US Coast Guard Travelling Inspectors' Centenary

July 2014 marked the 100th anniversary of the traveling inspection staff, originally created under the Steamboat Inspection Service. These travelers are highly

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Port Authority Ship Electronics Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1781 sec (6 req/sec)