Incat Crowther Works on New Yacht Project

Press Release
Tuesday, May 31, 2011

Incat Crowther is pleased to announce its involvement in a new motor yacht project. The Curvelle quaranta is a 33m Catamaran yacht currently under construction that has brought together a team of world leading design and engineering firms to create a modern, flexible and efficient yacht concept.

Logos Marine is managing and coordinating all aspects of the build at the Istanbul yard, whilst Lila-Lou of London is responsible for exterior styling and interior design. Composite engineering will be performed by SP High Modulus.

The vessel will offer owners a new level of functionality, with 6 large cabin spaces are located on the main deck. Each of these spaces can be configured as twin or double staterooms, or combined with the adjacent spaces to create 3 large suites.

Crew accommodation and service spaces are provided in the hull, whilst a large lounge and dining space occupies the upper deck aft of the wheelhouse.

Incat Crowther brings their wealth of experience to the project by providing a full naval architecture package.

The vessel will be powered by a pair of Caterpillar C32 Acert main engines, each producing 1417kW at 2300rpm. The shaft line will consist of ZF3050 gearboxes and a pair of fixed-pitch propellers. The vessel will have a maximum speed of 25 knots, and will cruise at 23 knots. Incat Crowther has used its extensive experience to engineer a vessel that is optimised for efficient cruising and optimum range, with a stated aim of Trans-Atlantic cruising.

Incat Crowther is pleased to be a part of this project team, bringing a wealth of experience and knowledge to the project, which in turn will deliver a highly efficient and comfortable yacht that will carry the Curvelle brand.

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Naval Architecture

3D Machining Puts Wind in the Sails

With ESPRIT CAM software, Armor Mécanique has the wind in its sails; 50% time savings, better quality and new markets thanks to 3D machining Established in 1984

Changes in Aker Solutions' Top Deck

Tore Sjursen will assume the position as executive vice president for operational improvement and risk management at Aker Solutions on April 1. Knut Sandvik

Wärtsilä's' New Plant in Brazil

Following an investment of 20 million euros, Wärtsilä's' new unit will produce and test motor generators and thrusters   Wärtsilä's first unit at Porto do Açu in São João da Barra (RJ),

 
 
Maritime Careers / Shipboard Positions Maritime Standards Navigation Offshore Oil Pod Propulsion Port Authority Ship Electronics Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1350 sec (7 req/sec)