ES Group Updates Singapore Bunker Barge Deliveries

Monday, December 31, 2012

One vessel has arrived in Singapore waters, and the other is to be delivered in Q1 2013.

Sea Tanker I has arrived in Singapore waters and is currently undergoing local certifications and surveys. It is now expected to be delivered to the charterer by the first quarter of 2013 instead of the planned second half of 2012.

Sea Tanker II, which will be sold to the charterer of Sea Tanker I (the purchaser), is currently undergoing commissioning and sea trials in Thailand, and is now expected to be delivered to that purchaser by the first half of 2013 instead of the planned 2H2012.

Barring any unforeseen circumstances, the demise charter of Sea Tanker I and the sale of Sea Tanker II, in aggregate, is expected to contribute to the Group’s financial performance in the financial year ending 31 December 2013.

 

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Scottish Sea Farms Orders Newbuilds

Macduff Shipyards Ltd. has received a contract worth more than £3.3 million pounds from Scottish Sea Farms for the design and build of four 19.8-meter 150T steel

LNG Transport Barge Design Approved by ABS

Conrad Shipyard, L.L.C. engaged Bristol Harbor Group, Inc. (BHGI) to develop a 3,000 cubic meter Liquefied Natural Gas (LNG) transport barge utilizing a Bristol

Airbus May Sell Stake in Submarine Supplier

Airbus is considering a sale of its 49 percent stake in submarine supplier Atlas Elektronik as part of a reshuffle of its military business, German newspaper Die

Fuels & Lubes

MARAD: Total Fuel Cycle Study for Natural Gas

The Maritime Administration (MARAD) released a study that evaluates total fuel cycle emissions for natural gas versus conventional marine fuels. Results showed

LNG Transport Barge Design Approved by ABS

Conrad Shipyard, L.L.C. engaged Bristol Harbor Group, Inc. (BHGI) to develop a 3,000 cubic meter Liquefied Natural Gas (LNG) transport barge utilizing a Bristol

LNG America Selects Topside Designer for LNG Bunker Barge

LNG America has selected Taylor-Wharton to commence the front-end engineering and design work for the cryogenic topside of the company’s 3,000 cubic meter Gemini

Barges

Scottish Sea Farms Orders Newbuilds

Macduff Shipyards Ltd. has received a contract worth more than £3.3 million pounds from Scottish Sea Farms for the design and build of four 19.8-meter 150T steel

MN 100: AEP River Operations

16150 Main Circle Drive, Suite #400 St. Louis, MO 63017 Tel: (636) 530-2100  Email: info@aepriverops.com Website: www.aepriverops.com President: Keith Darling The

LNG Transport Barge Design Approved by ABS

Conrad Shipyard, L.L.C. engaged Bristol Harbor Group, Inc. (BHGI) to develop a 3,000 cubic meter Liquefied Natural Gas (LNG) transport barge utilizing a Bristol

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Offshore Oil Pipelines Pod Propulsion Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0752 sec (13 req/sec)