'USS Guardian' Navy Update

Press Release
Sunday, February 03, 2013
Waves Break Over USS Guardian: Photo credit USN

The Navy has determined that  23-year old 'USS Guardian' will be dismantled & removed in sections from the reef.

"Guardian is badly damaged and with the deteriorating integrity of the ship, the weight involved, and where it is grounded on the reef, dismantling in sections is the only supportable option," said Capt. Darryn James, U.S. Pacific Fleet spokesman. "We have the right team of experienced professionals to conduct this complex operation and to ensure that it is done safely while minimizing damage to the surrounding marine environment."



The first Navy contracted floating crane from Singapore is due to arrive in the next few days, and then the dismantling operation will take more than one month. The Navy has presented a dismantling plan to the Philippine Coast Guard that maintains the floating cranes necessary for this operation in deeper water in order to minimize coral damage to Tubbataha Reef.

Since Guardian's grounding, the Navy has been working meticulously to salvage any reusable equipment, retrieve the crew's personal effects, and remove any potentially harmful materials including petroleum-based products and human wastewater. USS Mustin (DDG 89), USNS Bowditch, M/V Trabajador, USNS Salvor (T-ARS 52) and the Malaysian tug VOS Apollo remain on scene supporting the salvage operation.

There were no injuries when Guardian ran aground Jan. 17 following a port visit to Subic Bay while in transit to Indonesia. Commander, U.S. Seventh Fleet has ordered an investigation to assess the circumstances and facts surrounding the grounding.


Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Vard Orders Parat Electric Steam & Hot Water Boilers

During the last month, PARAT Halvorsen AS has collected four new boiler plant orders from the Vard Group and their multipurpose platform ships of Vard 1 08 design.

Newport News Selects Paramarine Design Software

QinetiQ’s Paramarine Ship and Submersible Design Software has been selected by Newport News Shipbuilding (NSS) as its primary naval architectural software. QinetiQ

VOSTA LMG Secures Order From Boskalis

VOSTA LMG has been awarded an order for efficient dredge ball joints from maritime services company Royal Boskalis Westminster. The order consists of a series

Navy

Today in U.S. Naval History: September 2

Today in U.S. Naval History - September 2 1918 - Navy ships and crews assist earthquake victims of Yokohama and Tokyo, Japan 1940 - Destroyer-for-Bases agreement between U.

STS Young Endeavour Prepares for World Voyage

The Royal Australian Navy operated Sail Training Ship, Young Endeavour, is undergoing maintenance work in preparation for a 12-month world circumnavigation. It

Newport News Selects Paramarine Design Software

QinetiQ’s Paramarine Ship and Submersible Design Software has been selected by Newport News Shipbuilding (NSS) as its primary naval architectural software. QinetiQ

 
 
Maritime Security Maritime Standards Naval Architecture Offshore Oil Port Authority Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1764 sec (6 req/sec)