Oil Drilling at World Record Depth in GofM

Press Release
Thursday, September 13, 2012
FPSO BW Pioneer: Photo credit Petrobas

Petrobras's floating production, storage and offloading platform, FPSO BW Pioneer begins production from record depth.

FPSO BW Pioneer, moored some 250 kilometers off the coast of the State of Louisiana in the U.S. Gulf of Mexico, is the first FPSO to produce oil and gas in the Gulf, with processing capacity of 80,000 barrels of oil and 500,000 cm3 gas per day, and storage facilities for 500,000 barrels of oil. It is moored at a world-record water depth of 2,500 meters.

The Chinook #4 production well was drilled and completed in Lower Tertiary reservoirs (formed between 23 and 65 million years ago), a promising offshore exploration frontier located at a depth of around 8,000 meters. The well is connected to the FPSO by a system incorporating subsea equipment and lines, in addition to free-standing risers (vertical production lines). Oil will be transported to shore on shuttle tankers, and gas through pipelines.

Petrobras is the first company to develop an oilfield in the Gulf of Mexico using these technologies, tried and tested with excellent results in Brazil.

The Cascade and Chinook development projects were deployed in full compliance with Petrobras' Safety, Environment, Energy Efficiency and Health guidelines, and these standards will be strictly maintained throughout this new production phase.


 

 

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

BMT WBM to Showcase TUFLOW at World Bank Seminar

BMT WBM ( (BMT), a subsidiary of BMT Group Ltd, a leading international engineering and risk management consultancy, is delighted to announce that it will be presenting

Senator Kaine Tours NNS Apprentice School

Huntington Ingalls Industries (HII) apprises that it has hosted Sen. Tim Kaine, D-Va., for a tour of The Apprentice School at the company's Newport News Shipbuilding division.

Rosneft Restores Meteorological Observations System in Kara Sea

As part of a large-scale summer Arctic research expedition "Kara-Summer - 2014" a meteorological station was installed that meets the latest modern requirements for such equipment,

Offshore

Keppel T & T Appoints Lim Chin Leong to its Board

Keppel Telecommunications & Transportation Ltd (Keppel T&T) has strengthened its Board with the appointment of Mr Lim Chin Leong as an independent, non-executive

Odfjell Drilling in Tighter 2Q North Sea Market

Odfjell Drilling reports second quarter 2014 financial results showing a profit of US$29-million. Profit & loss Q2 2014 Operating revenue for Q2 2014 was USD 272 million (USD 289 million),

Brazil AHTS Contract Breakthrough for Havyard

Havyard says it is to deliver the ship design and equipment for four anchor handling tug supply (AHTS) vessels that are to be built and operated by the Brazilian

 
 
Maritime Standards Naval Architecture Navigation Pipelines Pod Propulsion Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2708 sec (4 req/sec)