Oil Drilling at World Record Depth in GofM

Press Release
Thursday, September 13, 2012
FPSO BW Pioneer: Photo credit Petrobas

Petrobras's floating production, storage and offloading platform, FPSO BW Pioneer begins production from record depth.

FPSO BW Pioneer, moored some 250 kilometers off the coast of the State of Louisiana in the U.S. Gulf of Mexico, is the first FPSO to produce oil and gas in the Gulf, with processing capacity of 80,000 barrels of oil and 500,000 cm3 gas per day, and storage facilities for 500,000 barrels of oil. It is moored at a world-record water depth of 2,500 meters.

The Chinook #4 production well was drilled and completed in Lower Tertiary reservoirs (formed between 23 and 65 million years ago), a promising offshore exploration frontier located at a depth of around 8,000 meters. The well is connected to the FPSO by a system incorporating subsea equipment and lines, in addition to free-standing risers (vertical production lines). Oil will be transported to shore on shuttle tankers, and gas through pipelines.

Petrobras is the first company to develop an oilfield in the Gulf of Mexico using these technologies, tried and tested with excellent results in Brazil.

The Cascade and Chinook development projects were deployed in full compliance with Petrobras' Safety, Environment, Energy Efficiency and Health guidelines, and these standards will be strictly maintained throughout this new production phase.


 

 

Maritime Reporter November 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

Liquefaction Terminals to Dominate LNG Capital Expenditure

Capital expenditure (Capex) on global LNG facilities is expected to total $259 billion (bn) over the period 2015-2019, with investments expected to be 88% larger

Ennsub Delivers ROV Deployment Systems

Ennsub has completed the design and manufacture of two workclass remotely operated vehicle (WROV) deployment systems for ROVOP, due to be installed into a newbuild

Wärtsilä to Proceed with first LNG Terminal

Wärtsilä has been given full notice to proceed (NTP) from Manga LNG Oy for the supply of a liquefied natural gas (LNG) import terminal in Tornio, Northern Finland.

Offshore

DNV GL Targets Safer Approach to Subsea Lifting

The completion of a joint industry project (JIP) to improve existing standards and regulations around subsea lifting operations has resulted in a new recommended practice (RP).

Polarcus Awarded 3D Project Off West Africa

Polarcus Limited has signed a letter of intent with Perenco Oil & Gas Gabon S.A. for a 3D marine seismic acquisition project offshore West Africa.   The project,

Boskalis, VolkerWessels Win Offshore Wind Farm Work

Royal Boskalis Westminster N.V., in partnership with Volker Stevin International (VolkerWessels), has been awarded a contract by Iberdrola Renewables Offshore Deutschland

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1779 sec (6 req/sec)