JK Fabrication’s Emergency Towing Reel

By Joseph Keefe
Monday, April 22, 2013

You’ve got an emergency towing wire. Of course you do. It’s rusted beyond belief, probably retired from primary service two years ago when it developed that kink and those nasty fishhooks. And, it’s deployed where it should be; out on deck, in the open and exposed to the elements. Will it perform when you need it most? Probably not. It doesn’t have to be that way. According to JK Fabrication, the current system of storing wire on a front splash plate insures that the wire will fail as it has very tight radius bends and is rusted in a very short time. When pulled hard in an emergency, the wire will break from tight radius fatigue in rusted areas.
Moving forward with a proven design of a non-required, but nevertheless key safety item, JK Fabrication has already installed several of their patented Emergency Towing Reels. Already being purchased by industry despite the lack of classification society or Coast Guard mandate, the JKF emergency towing reel is a simple and proven means of storing an emergency tow line and facilitates fast and safe deployment when that becomes necessary. Already in service on a number of major operator’s barges, the units have been successfully deployed to avert disaster in the face of parted towing lines and other casualties.
The unit is capable of carrying a number of different diameters and lengths of wire cables in a compact, easy to access and quickly deployable fashion. JK Fabrication continues to look for Coast Guard approvals or other regulatory mandates for this type of equipment, but in general, emergency towing arrangements are required only on tankships 20,000 deadweight tons and above, while tank barge towing and anchor arrangements are based primarily on route and service. That doesn’t mean it isn’t a good idea.
The unit can include a hot-dipped galvanized finish or a two-part marine epoxy coating. The storage reel is designed and engineered to survive in harsh salt water conditions and to provide years of reliable service with its large wire capacity, stainless steel tension brake, bolt-down mount and protective cover. With the bolt-down mounting design this system can be simply switched from barge to barge or stored in the warehouse for the next voyage. Simple to deploy, when the pick-up line is pulled, the emergency tow line runs completely off of the reel and engages with the auxiliary tow chain, allowing you to continue the tow and complete your voyage. To date, JK Fabrication has sold about 10 units to industry for service on fuel barges and container barges. It goes without saying that they hope that their device will become the new standard in design for retrieving a loose barge, ship, ferry, or any other marine vessel.


(As published in the April 2013 edition of Marine News - www.marinelink.com)

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Materials

Dubai Partners with WOC on Ocean Sustainable Dwevelopment

The Dubai Council on Marine and Maritime Industries (DCMMI) and the World Ocean Council (WOC) have agreed to collaborate on ocean sustainable development and corporate ocean responsibility.

Inspection Features Added to PropCad Premium

It is common practice to inspect marine propellers to ensure the manufactured product meets the thickness and pitch specified by the design. PropCad Premium now

Report on Health of Seagrass in Cleveland Bay

Port of Townsville Limited (POTL) has released the 2015 Annual Seagrass Health Survey carried out in Cleveland Bay during 2015. The survey, commissioned annually since 2007 at a cost of around $70,

Marine Equipment

SRH Marine and Setel Powerline Pact for Greek Market

SRH Marine Electronics SA and SETEL PowerLine Ltd have entered a Reseller and Installation Partner Agreement.    Through this cooperation SRH is able to offer

GloMEEP Project Forges Ahead with Train-the-Trainer Workshop

A global Train-the-Trainer workshop on energy efficiency has been delivered in China (23-27 May), preparing the personnel needed to cascade knowledge on energy

Diana Charters Out Two Bulkers

Diana Shipping Inc. today announced that, through a separate wholly-owned subsidiary, it entered into a time charter contract with Bunge S.A., Geneva, for one of its Panamax dry bulk vessels,

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Offshore Oil Pipelines Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0998 sec (10 req/sec)