Harvey Gulf Breaks Ground with LNG Facility

marinelink.com
Monday, February 17, 2014
Artist's Depiction: the Harvey Gulf LNG Fuleing facility in Port Fourchon, LA.

Louisiana out in front on LNG bunkering infrastructure.

New Orleans-based Harvey Gulf International Marine (HGIM) has announced the ground breaking of construction on its $25 million Phase 1, Slip B, LNG (Liquefied Natural Gas) fueling facility at their Port Fourchon, LA terminal. When operational later this year, HGIM’s LNG facility will be the first of its kind in the United States. This technologically-advanced, environmentally-safe, clean energy facility will be a vital addition to the growing national LNG supply infrastructure, supporting critical operations of the oil and gas industry’s offshore fleet as well as over-the-road vehicles operating on clean LNG.

"Today’s milestone represents another significant step in the path for Harvey Gulf to establish itself as the nation’s leader in utilizing LNG as a marine fuel. HGIM is investing $350 million in the construction of a LNG-operated fleet. The dual fuel vessels and our LNG facility further expand HGIM’s commitment to develop and utilize the safest, most environmentally-friendly vessels and fuel technology available today. This fleet and facility signify a strong partnership between the State of Louisiana, the U.S. Department of Energy, the U.S. Coast Guard, and Harvey Gulf with a common goal of leading our nation down the path of clean energy use and strengthening America’s future of energy independence,” said CEO Shane Guidry.

HGIM selected Lockheed Martin, Michoud Facility for the construction of the facility LNG storage tanks further expanding on their participation in the dual fuel vessel construction program. HGIM contracted CH-IV International of Houston, TX as the FEED and EPC contractor and Matrix PDM Engineering of Pittsburgh, PA for detail design and engineering. Civil engineering services are being provided by Carubba Engineering of Metairie, LA.

The LNG facility will consist of two sites each having 270,000 gallons of LNG storage capacity. The LNG tanks will be of stainless steel, Type ‘C’ construction. Each facility will be able to transfer 500 gallons of LNG per minute. In addition to bringing energy-saving and environmentally-friendly maritime fuel to Louisiana, Harvey Gulf will be bringing significant economic impact. Harvey Gulf’s LNG facility will generate 70 new full-time jobs and another 120 jobs to handle its Port Fourchon operations and fleet of LNG vessels.

Maritime Reporter July 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

CWind Joins National Workboat Association

Citing crew transfer services as an integral part of its offering, offshore wind industry service provider CWind announced it is now a member of the National Workboat Association (NWA) of the U.

BG Group Starts up Sixth FPSO in the Santos Basin

BG Group announced first oil from the Cidade de Itaguaí floating, production, storage and offloading (FPSO) vessel, the sixth unit to start production across the

BG Awards Fugro MBES, Seabed Coring Contract

Fugro has been awarded a contract by BG International Limited Sucursal Honduras to conduct an integrated multibeam echosounder (MBES) survey and seabed coring campaign

Environmental

S.Africa Considering Ship-Based Power Generation

South Africa could deploy power barges using gas to generate electricity to help overcome chronic supply shortages, a senior government official said on Tuesday.

NYK Hosts Safety Conference

Over three dates in July, NYK hosted a safety promotion conference for shipowners and ship-management companies at the NYK head office in Tokyo and at Imabari city in Ehime prefecture.

El Nino Onset May Impact Panama Canal Drafts

The Panama Canal Authority closely monitors the water levels of Gatun and Alhajuela lakes on a regular basis due to the importance that these resources have for transit operations.

Fuels & Lubes

S.Africa Considering Ship-Based Power Generation

South Africa could deploy power barges using gas to generate electricity to help overcome chronic supply shortages, a senior government official said on Tuesday.

Koole Expands Rotterdam Operations

Koole Terminals has begun operations at the storage facility for petrol and diesel in Pernis that it recently acquired from BP.   The companies have a long-standing relationship.

Tanker Retrofitted with Dual Fuel Engine

Caterpillar Marine informs it has begin a dual fuel engine retrofit conversion onboard the 472-foot Fure West tanker, owned by Furetank Rederi A/B. The MaK M 43

Marine Power

S.Africa Considering Ship-Based Power Generation

South Africa could deploy power barges using gas to generate electricity to help overcome chronic supply shortages, a senior government official said on Tuesday.

Australian PM Promises 2500 Shipbuilding Jobs

Up to 2,500 shipbuilding jobs in Adelaide will be safe for "all time", the Prime Minister says, ahead of the expected announcement to build a new fleet of Navy ships worth $39 billion, reports ABC.

GE Gas Turbines to Power US Navy’s New Destroyers

The U.S. Navy’s new DDG 121 and DDG 122 Arleigh Burke-class destroyers will be powered by eight LM2500 marine gas turbines supplied by GE Marine, who also received

Maritime Security

Pressure for Australia Sub Deal Grows

Australia to spend A$65 bln on ships and subs over 20 years; PM pledges A$40 bln for domestic shipbuilders. Australia will spend A$89 billion ($65 billion) on

Asian Nations Call for Stop to South China Sea Land Work

Calls grow for China to halt land reclamation. Southeast Asian countries on Tuesday backed a U.S. call to halt land reclamation in the South China Sea, underlining

Latest USCG Cutter At Boston Harbor

The Coast Guard’s latest 418-foot National Security Cutter James (WSML 754) entered Boston Harbor August 3, 2015. The James is the fifth of eight planned National

LNG

S.Africa Considering Ship-Based Power Generation

South Africa could deploy power barges using gas to generate electricity to help overcome chronic supply shortages, a senior government official said on Tuesday.

Egypt Gets FSRU from BW Gas

Norway-based BW Gas will provide Egypt with a liquefied natural gas (LNG) floating import terminal under a five-year contract.   This comes as as the North African

Tanker Retrofitted with Dual Fuel Engine

Caterpillar Marine informs it has begin a dual fuel engine retrofit conversion onboard the 472-foot Fure West tanker, owned by Furetank Rederi A/B. The MaK M 43

Maritime Safety

Marad Visits TX Maritime Technology & Training Center

United States Maritime Administration tours Maritime Technology and Training Center site.   Administrators from the United States Maritime Administration (MARAD),

Asian Nations Call for Stop to South China Sea Land Work

Calls grow for China to halt land reclamation. Southeast Asian countries on Tuesday backed a U.S. call to halt land reclamation in the South China Sea, underlining

Latest USCG Cutter At Boston Harbor

The Coast Guard’s latest 418-foot National Security Cutter James (WSML 754) entered Boston Harbor August 3, 2015. The James is the fifth of eight planned National

 
 
Maritime Contracts Maritime Security Offshore Oil Pipelines Pod Propulsion Port Authority Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.3870 sec (3 req/sec)