Huisman Opens New Office in Norway

MarineLink.com
Wednesday, August 14, 2013
Bergen

Huisman, a worldwide specialist in lifting, drilling and subsea solutions, recently opened up a new office in Bergen, Norway: Huisman Norge AS. The new representational office is a 100% subsidiary of Huisman and is set up to meet the increasing demand within the Norwegian offshore market. This is the first Huisman office in Scandinavia.

Huisman is a globally operating company with history in design and manufacturing of heavy construction equipment for world's leading on and offshore companies. Founded in 1929 and originally a Dutch steel construction company - Huisman joined forces with the engineering company Itrec in 1987 to develop high quality products entirely under own management, from concept to installation.

The company’s product range can be subdivided into six main categories: cranes, drilling equipment, pipelay equipment, winches, vessel designs and specials and varies from stand-alone components to highly engineered integrated systems. Production is divided between the production facilities in The Netherlands, China and the Czech Republic. A new production facility in Brazil is currently under construction. Additional sales, engineering and service offices are located in Slovakia, Brazil, Singapore and the U.S.

Huisman Norge AS is headed by Geir Bjørkeliwho has 20 years of experience in the offshore industry. He said, “By establishing a Norwegian office Huisman can be more responsive to demands from Norwegian clients. Bergen is the perfect location to serve the Norwegian market, as it is one of the most complex maritime clusters in the world and has a strong position in the global maritime market.”

huismanequipment.com
 

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Sapurakencana Wins 3 Petronas Oil blocks

SapuraKencana Petroleum Berhad today announced that it has entered into Sale and Purchase Agreements to acquire the entire interest of PETRONAS in 3 blocks offshore

Kemp Succeeds Semple at Wood Group

Wood Group announced following changes to its senior management team. Alan Semple, chief financial officer (CFO) has advised the board that he intends to

ST Engineering Rejigs Top Deck

Singapore Technologies Engineering Ltd (ST Engineering) today announced the appointment of senior management personnel to new key management positions in the

Energy

Sapurakencana Wins 3 Petronas Oil blocks

SapuraKencana Petroleum Berhad today announced that it has entered into Sale and Purchase Agreements to acquire the entire interest of PETRONAS in 3 blocks offshore

Kemp Succeeds Semple at Wood Group

Wood Group announced following changes to its senior management team. Alan Semple, chief financial officer (CFO) has advised the board that he intends to

Baker Hughes to Present at Wells Fargo's 2014 Energy Symposium

Baker Hughes Incorporated announced today that the Company's Vice President and Chief Strategy Officer, Derek Mathieson, will present at Wells Fargo's 2014 Energy Symposium on Wednesday,

News

USCG Assist Duck Hunters Near Harrington Beach Park

The Coast Guard and the Port Washington and Cedar Grove Fire Departments came to the assistance of two duck hunters on Lake Michigan Friday. The names of those involved are not being released.

Sapurakencana Wins 3 Petronas Oil blocks

SapuraKencana Petroleum Berhad today announced that it has entered into Sale and Purchase Agreements to acquire the entire interest of PETRONAS in 3 blocks offshore

Kemp Succeeds Semple at Wood Group

Wood Group announced following changes to its senior management team. Alan Semple, chief financial officer (CFO) has advised the board that he intends to

Marine Equipment

ST Engineering Rejigs Top Deck

Singapore Technologies Engineering Ltd (ST Engineering) today announced the appointment of senior management personnel to new key management positions in the

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

Sea Star Line: Equipment Replacement Plan on Track

Company Receives New Refrigerated Containers and Places Order for New Genset Equipment   Sea Star Line, LLC began receiving the first of its new 100 40’ and 45’

Offshore Energy

Sapurakencana Wins 3 Petronas Oil blocks

SapuraKencana Petroleum Berhad today announced that it has entered into Sale and Purchase Agreements to acquire the entire interest of PETRONAS in 3 blocks offshore

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

Update: Explosion in the Gulf of Mexico

An explosion occurred aboard a production platform Thursday at West Delta 105, operated by Fieldwood Energy, resulting in one fatality and three injured. The Bureau

Underwater Engineering

Sapurakencana Wins 3 Petronas Oil blocks

SapuraKencana Petroleum Berhad today announced that it has entered into Sale and Purchase Agreements to acquire the entire interest of PETRONAS in 3 blocks offshore

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

EMGS to Map Brazil's Gas Hydrates

Electromagnetic Geoservices ASA (EMGS) has received a contract worth USD 1.5 million for a research project in Brazil. The project will use 3D EM data to map

 
 
Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2650 sec (4 req/sec)