Logistical Scenario Analysis for Hydrodynamic Applications

By Jorrit-Jan Serraris
Tuesday, September 02, 2014
Jorrit-Jan Serraris

To calculate the operability of the whole logistics chain, rather than only individual operations, MARIN has developed the hydrodynamic scenario analysis program ScenSim.

The uptime, or operability, of a specific operation can be calculated with existing methods and tools in different ways. However, each specific operation is often just a small stage in a long chain.
When planning an operation a key parameter is to know the efficiency and duration of the operation. When the operation is a continuous process, such as the iterative transport of cargo between locations, or when the operation consists of a successive series of operations, such as installing an offshore wind park, variations in weather and the availability of cargo can impact the operation. The varying nature of these ‘disturbances’ and the effect they have on the complete logistical chain make it difficult to determine the efficiency or duration of the whole operation. To support developers, planners and engineers to determine the efficiency of a logistical chain from a hydrodynamic point of view, MARIN developed ScenSim.
The program simulates the logistics of shipping and offshore operations by combining MARIN’s existing hydrodynamic programs into a logistic scenario. A scenario can consist of multiple vessels, locations and iterations interacting with each other.
ScenSim is based on a time step approach. Initially the operability of each vessel is calculated at every time step, then the interactions between vessels, cargo and locations are determined and finally the status of each object is updated. At the end time of the simulation the program shows how much cargo was handled and transported during the whole simulation and the total time required to perform the whole scenario.
The scenario analysis program facilitates the simulation of the complete logistical chain from a hydrodynamic point of view. ScenSim can be used to indicate bottlenecks in the logistical chain so these can be eliminated, thereby increasing uptime and improving the overall efficiency.
 

The Author
Jorrit-Jan Serraris is senior project manager at the Offshore Department of MARIN, the Maritime Research Institute Netherlands.
e: j.w.serraris@marin.nl

 

(As published in the August 2014 edition of Maritime Reporter & Engineering News - http://magazines.marinelink.com/Magazines/MaritimeReporter)

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter June 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

New Products

Maersk Takes Coffee Very Seriously

Maersk acknowledges that coffee is very special, mainly in regards to the processes and requirements involved for it’s shipping. "So we have adapted the way we work so we can meet your needs,

MSC Jade Sails with MAN's Biggest Engine

The largest and most powerful engine from MAN Diesel & Turbo’s portfolio ever designed and built has entered service.   Built by Doosan Engine in Korea and rated at 75,

Statoil’s 50 years to be Recorded

Statoil has decided to launch a large project to write the story about the company for its 50th anniversary in 2022. The University of Oslo has been chosen the

Software Solutions

DNV GL's Sesam GeniE Reduces Engineering Costs

When warping analysis is required during design of certain types of beam offshore structures, it can involve many costly hours of manual calculations by senior engineers.

Simrad Tech for Sydney Fast Ferries

Four new fast ferries, owned and managed by Manly Ferries and operating in the busy waters of Sydney Harbour, will use Simrad technology for safe navigation. The

Demand for Helm CONNECT Software Soars ahead of Subchapter M

Helm Operations  signed on more than 50 commercial maritime companies to its  maritime software, Helm CONNECT, many of whom are trying to prepare for the publication of Subchapter M.

Logistics

Maersk Takes Coffee Very Seriously

Maersk acknowledges that coffee is very special, mainly in regards to the processes and requirements involved for it’s shipping. "So we have adapted the way we work so we can meet your needs,

World Trade Routes Won't be the Same with Expanded Panama Canal!

On 26th June 2016, a landmark development for the shipping industry will occur with the opening of the new third set of locks at the Panama Canal. Clarksons Research takes a look.

CMA CGM to use Kingston As Transshipment Hub

French shipping giant CMA CGM plans to use Kingston Container Terminal,  Jamaica as a strategic Caribbean transshipment hub for an enlarged Panama Canal. The Port connects to US East Coast,

 
 
Maritime Security Naval Architecture Offshore Oil Pod Propulsion Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0763 sec (13 req/sec)