Georgia Increases Funding for Port Deepening

Posted by Greg Trauthwein
Thursday, March 20, 2014

Deal to Sign Budget with $35M More for Port Deepening; State has allocated $266 million to Savannah Harbor Expansion

The $35 million in additional port deepening funds proposed by Georgia Gov. Nathan Deal has been approved by the state legislature and now awaits the governor’s signature. Along with previous funding, Georgia has now allocated $266 million, fulfilling the state’s portion of the Savannah Harbor Expansion Project (SHEP).


“Lawmakers across Georgia recognize that improving the Savannah Harbor is critically important to the continued economic health of this state and region,” Deal said. “That unified vision is also evident among our delegation to Washington, which has worked tirelessly to secure the federal portion of the project costs. It is now long overdue for the federal government to fund their portion of this federal project to make U.S. manufactured products more competitive overseas.”


Deepening the Savannah Harbor from 42 to 47 feet will accommodate an increase in the number of super-sized container vessels transiting the Panama Canal after its 2015 expansion. With a deeper channel, larger and more heavily laden ships can arrive and depart with greater scheduling flexibility. These “Post Panamax” vessels will lower shipping costs per container slot.


A U.S. Army Corps of Engineers study has shown that SHEP will reduce shipping costs for private companies by $174 million a year.  The new funding was part of Gov. Deal’s FY2015 budget request, and was included in the final version of the state spending plan passed by the General Assembly earlier this week.

Approved by the Environmental Protection Agency, the Fish and Wildlife Service and the National Marine Fisheries Service, the project is anticipated to cost $652 million. The Corps of Engineers study shows a 5.5-to-1 benefit to cost ratio, meaning that for every dollar spent on the deepening, the nation will reap $5.50 in benefits.


“The $266 million in state funding for SHEP is enough to allow significant progress on the project, including environmental improvements such as rerouting freshwater flows, and improvements to the outer harbor,” said GPA Executive Director Curtis Foltz. “Besides deepening the channel, the harbor expansion will also include general navigation improvements, such as wider channel turns and a larger turning basin.”


 

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ports

USCG Tall Ship Sailing to the Bahamas

The U.S. Coast Guard Cutter Eagle is scheduled to arrive at Berth 14 at Prince George Wharf in Nassau, Bahamas on Thursday, May 28 as part of its 2015 cadet summer training deployment.

Shipping Freight Rates Drop Amidst Overcapacity

Shipping freight rates on the world's busiest route, from Asia to Northern Europe, fell by the largest percentage amount since 2008, reflecting wild volatility

WFP: Aid Cargo for Yemen will be Delivered After Ship Docks

The World Food Programme will deliver a cargo of Iranian aid for Yemen once the ship carrying it reaches Djibouti's port, the U.N agency said on Friday. Earlier

Container Ships

Shipping Freight Rates Drop Amidst Overcapacity

Shipping freight rates on the world's busiest route, from Asia to Northern Europe, fell by the largest percentage amount since 2008, reflecting wild volatility

HSH Bank to Split Off Bad Shipping Loans

German lender HSH Nordbank could split off a "bad bank" for non-performing shipping loans as part of a plan to create a sustainable business model, according to a person familiar with the matter.

18 Kalmar RT 240s for US DoD

Kalmar, part of Cargotec, has received an order to supply a further 18 rough terrain container handlers to the United States Department of Defense. Destined to replace older equipment,

Government Update

US Funding for Air Emissions/Alternative Energy Projects

The U.S. Maritime Administration (MARAD) announced that up to $1.3 million in Federal funding is now available through cooperative agreements for projects supporting

WCI Applauds Increased USACE Funding

Today WCI applauded the leadership of Senate Appropriations Committee Chairman Thad Cochran (R-MS) and Senate Energy & Water Development (E&WD) Appropriations Subcommittee

SoCal Beach Cleanup Could Take Months

The U.S. Coast Guard captain overseeing cleanup of oil spilled from a pipeline rupture that closed two California state beaches and fouled offshore waters near

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Ship Repair Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1871 sec (5 req/sec)