BOEMRE, USCG to Conduct Seventh Session of Investigation into Deepwater Horizon

Thursday, March 24, 2011
The Bureau of Ocean Energy Management, Regulation and Enforcement (BOEMRE)/U.S. Coast Guard (USCG) Joint Investigation Team, which is examining the Deepwater Horizon explosion and resulting oil spill, today announced that it will hold a seventh session of public hearings the week of April 4, 2011. The hearings, which will focus specifically on the forensic examination of the Deepwater Horizon blowout preventer (BOP), are scheduled to take place at the Holiday Inn Metairie, New Orleans Airport, 2261 North Causeway Blvd., Metairie, La.
 
BOEMRE and the Coast Guard have made the forensic examination report prepared by U.S. Det Norske Veritas (DNV) Columbus, the contractor that performed the examination, available to the parties-in-interest in the investigation, members of the Technical Working Group who witnessed the examination at NASA's Michoud Facility in New Orleans, La., and the public. The two volume report is available online (http://www.deepwaterinvestigation.com/external/content/document/3043/1047291/1/DNV%20Report%20EP030842%20for%20BOEMRE%20Volume%20I.pdf)
 
The forensic examination is one aspect of the much broader comprehensive investigation into the causes of the Deepwater Horizon explosion, loss of life, casualty loss, and the subsequent oil spill. Over the course of its investigation, the JIT has heard testimony from more than 70 witnesses and examined a broad range of material including photographs, video, data, documents, and physical evidence. Although the full investigation report is not expected to be released until sometime this summer, a report on the BOP and other matters is scheduled to be issued within the next month.
Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Government Update

EU Warship Provides Seychelles CG Training

EU Naval Force Warship 'FGS Berlin' has conducted local maritime capacity building in the Seychelles informs EUCAP Nestor. Three Local Maritime Capacity Building

FTA Approves WSF Ferry Terminal Plans

In the latest Washington State Ferries Weekly Update, Capt. George A. Capacci, Interim Assistant Secretary WSDOT/Ferries Division briefs as follows: "FTA approves

DoD Award Dredging, Ship Maintenance, Charter Contracts

US Department of Defense informs of placement of contracts for Chesapeake Bay dredging, dry-docking of USS Pearl Harbor, and charter of surface escort vessels. Details as follows: 1.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Navigation Pipelines Pod Propulsion Port Authority Ship Repair Ship Simulators
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1466 sec (7 req/sec)