BOEMRE Invites Comment on Nexen EA

Wednesday, May 04, 2011

The Bureau of Ocean Energy Management, Regulation and Enforcement (BOEMRE) today announced that public comment is invited with respect to an Environmental Assessment (EA) for an Initial Exploration Plan (EP) submitted by Nexen Petroleum USA Inc. This Initial EP involves deepwater activity in the Gulf of Mexico and will be completed in accordance with new safety and environmental standards implemented since the Deepwater Horizon explosion and oil spill.

 
The Initial EP includes four proposed exploratory wells in approximately 2,860 feet water depth, approximately 99 miles offshore Louisiana. Consistent with federal regulations, an EP is deemed “submitted” once all supporting materials and documentation has been provided. Once a plan is deemed submitted, BOEMRE has 30 calendar days to analyze and evaluate it.  For more information on pending plans, go to: http://www.gomr.boemre.gov/homepg/offshore/safety/well_permits.html.
 
As part of its review, the bureau will prepare an EA specific to the proposed exploration activities. Upon completion of the technical and environmental review, BOEMRE must decide whether to approve the plan, require modifications, or disapprove the plan. An exploration plan describes all exploration activities planned by the operator for a specific lease or leases, including the timing of these activities, information concerning drilling vessels, the location of each planned well, and other relevant information that needs to meet important safety standards.
 
The 30-day time frame for review includes a 10-day public comment period to allow an opportunity to review and comment on the issues that should be considered by BOEMRE in preparing the EA for the plan. In an effort to make the comment opportunity more accessible, the public can both view and provide comments on agency documents at:http://www.boemre.gov/PublicComment.htm

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter April 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Highest-Pull Wireline Conveyance System from Schlumberger

Schlumberger announced today the launch of the MaxPull high-pull wireline conveyance system that can pull from 18,000 lbf to 30,000 lbf in wells 40,000 ft [12,192 m] deep or more.

Cyberhawk Sinks Claws into US O&G Market

Cyberhawk Innovations, the world leader in aerial inspection and survey using Unmanned Aerial Vehicles (UAV), is set to boost its international credentials with

DNS Appoints Esson, Chief Executive

Decom North Sea (DNS), the representative body for the offshore decommissioning industry, which promotes and facilitates collaboration and cost reduction, today appointed a new chief executive.

Government Update

Cruise Ship Makes Historic Trip from US to Cuba

Cruise ship MV Adonia sailed into Havana this morning, completing the first leg of its historic inaugural voyage to Cuba that began on May 1, 2016, from Miami,

French PM: Aussie Subs to be built in Australia

French Prime Minister Manuel Valls said on Monday he was committed to building all of a new Australian submarine fleet in Australia, apparently contradicting the

Cruise Ship Sails from US tor Cuba for First Time in 50 Years

A cruise ship is sailing to Cuba from the U.S. for the first time in more than 50 years. The Bermuda-flagged Adonia sailed from the port of Miami carrying some 700 passengers on Sunday.

 
 
Maritime Contracts Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0764 sec (13 req/sec)