BOEMRE Invites Comment on Nexen EA

Wednesday, May 04, 2011

The Bureau of Ocean Energy Management, Regulation and Enforcement (BOEMRE) today announced that public comment is invited with respect to an Environmental Assessment (EA) for an Initial Exploration Plan (EP) submitted by Nexen Petroleum USA Inc. This Initial EP involves deepwater activity in the Gulf of Mexico and will be completed in accordance with new safety and environmental standards implemented since the Deepwater Horizon explosion and oil spill.

 
The Initial EP includes four proposed exploratory wells in approximately 2,860 feet water depth, approximately 99 miles offshore Louisiana. Consistent with federal regulations, an EP is deemed “submitted” once all supporting materials and documentation has been provided. Once a plan is deemed submitted, BOEMRE has 30 calendar days to analyze and evaluate it.  For more information on pending plans, go to: http://www.gomr.boemre.gov/homepg/offshore/safety/well_permits.html.
 
As part of its review, the bureau will prepare an EA specific to the proposed exploration activities. Upon completion of the technical and environmental review, BOEMRE must decide whether to approve the plan, require modifications, or disapprove the plan. An exploration plan describes all exploration activities planned by the operator for a specific lease or leases, including the timing of these activities, information concerning drilling vessels, the location of each planned well, and other relevant information that needs to meet important safety standards.
 
The 30-day time frame for review includes a 10-day public comment period to allow an opportunity to review and comment on the issues that should be considered by BOEMRE in preparing the EA for the plan. In an effort to make the comment opportunity more accessible, the public can both view and provide comments on agency documents at:http://www.boemre.gov/PublicComment.htm
Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Nabors Posts Quarterly Loss as Drilling Activity Slows

Offshore driller Nabors Industries Ltd reported a quarterly loss, hurt by lower drilling activity amid a slump in global crude prices.   The company posted a net loss of $891.

Maersk Drilling Secures Contract for Newest Drillship

Maersk Drilling was awarded a contract from eni Ghana Exploration and Production Ltd. for employment of the newbuild drillship Maersk Voyager.   The contract

Floater Orders 2014

25 Units Orders in 2014:  10 FPSOs, 1 Barge, 4 FLNGs, 7 FSRUs & 3 FSOs The overall number of orders is similar to the average ordering pace over the past 10 years,

Government Update

Manila Port Congestion Eased: Palace

Malacañang has declared that the congestion at the Port of Manila has been resolved, noting the various measures that the government and the private sector have implemented to address the problem.

Canadian Navy Delays Opening of Arctic facility

Canada's military has again delayed the opening of a major new Arctic port, a sign the government is struggling to assert sovereignty over a remote resource-rich region.

Zeroing in on Zukunft

The U.S. Coast Guard Commandant addresses a packed Passenger Vessel Association meeting and outlines both the challenges and opportunities facing his organization.

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Pod Propulsion Port Authority Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1225 sec (8 req/sec)