Marine Link
Friday, May 10, 2024
SUBSCRIBE

Arturo Grimaldi News

02 Jul 2012

Middle East Subsea Contract for Technip

The contract is for work in the South West Fatah and Falah fields, located 90 kilometers offshore Dubai, United Arab Emirates, at a water depth up to 53 meters. The EPIC contract scope includes the replacement of a 12-inch gas pipeline and six 18-inch water injection pipelines. Technip’s operating center in Abu Dhabi, United Arab Emirates, will execute the contract, which is scheduled to be completed at the end of 2012. Technip’s flagship S-Lay installation vessel, the G1201, will be used for pipelaying, as well as a diving support vessel. Arturo Grimaldi, Senior Vice President of Technip in the Middle-East, declared: “This contract is a significant milestone for Technip in the Middle East.

08 Sep 2011

Technip Wins Contract in Abu Dhabi

Development project. This field is located 200 kilometers northwest of Abu Dhabi, United Arab Emirates. The Satah Full Field Development project’s objective is to maximize crude oil production and oil recovery by reducing the well heads’ back pressure and introducing of gas injection and gas lift facilities. The project scope involves offshore brownfield works to the existing well head platforms and production manifold platform, installation of infield pipelines, as well as modifications and installation of new facilities at the Onshore Satah plant at Zirku Island. “This project award is the recognition of our expertise in the growing brownfield projects market in the Middle-East”, said Arturo Grimaldi, Senior Vice President of Technip in the Middle East.