Coast Guard Cutter, Bulk Carrier Collide on Lake Michigan

MarineLink.com
Monday, January 06, 2014
Coast Guard Cutter Hollyhock continues breaking ice as it transits to St. Ignace, Mich., to undergo a full damage assessment. (U.S. Coast Guard photo)

The U.S. Coast Guard reported that Cutter Hollyhock, a 225-foot seagoing buoy tender homeported in Port Huron, Mich., was involved in a collision with a 990-foot bulk carrier in northern Lake Michigan Sunday morning. The Hollyhock was conducting an ice escort at the time of the collision.

At about 10:45 a.m., the Hollyhock was breaking ice in front of the motor vessel Mesabi Miner during when the collision occurred. The cutter's crew reported significant damage to the stern and fantail, as well as two punctures in the hull about 20 feet above the waterline. The crew of the Mesabi Miner, en route to Gary, Ind., reported a 12-inch crack in the bow about 4 feet above the waterline and said the bow is pushed in about 8-12 inches.

No pollution or injuries have been reported concerning the incident and neither vessel has reported any flooding.

The Hollyhock arrived and moored up in St. Ignace, Mich., at about 8:30 p.m., Sunday. It is currently undergoing a complete damage assessment. The Coast Guard Cutter Biscayne Bay, a 140-foot ice-breaking tug, homeported in St. Ignace, escorted the Hollyhock as a precaution.

The Mesabi Miner will unload its cargo in Gary, Ind., and then the damage and planned repairs will be assessed.

uscgnews.com
 

  • Both the Hollyhock and the Mesabi Miner were damaged in the collision but were able to continue underway. (U.S. Coast Guard photo)

    Both the Hollyhock and the Mesabi Miner were damaged in the collision but were able to continue underway. (U.S. Coast Guard photo)

  • Mesabi Miner suffered a puncture in its bow about 4 feet above the waterline. (U.S. Coast Guard photo)

    Mesabi Miner suffered a puncture in its bow about 4 feet above the waterline. (U.S. Coast Guard photo)

Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Bulk Carrier Trends

First Ocean Vessel of 2015 Arrives at Port of Indiana

Northwest Indiana celebrates opening of gateway to global markets   The arrival of the 655-foot bulk carrier M/V Irma at the Port of Indiana-Burns Harbor signals

Bulk Carrier Grounds in St. Lawrence Seaway

A 621-foot bulk carrier ran aground near Wellesley Island in the St. Lawrence River, Monday. The U.S. Coast Guard (USCG) is responding.   The Bahamian-flagged

Baltic Index Up Slightly on Higher Rates for Large Vessels

The Baltic Exchange's main sea freight index, which tracks rates for ships carrying dry bulk commodities, rose slightly on Monday due to firmer rates for the large vessel segments.

News

SAAM SMIT Towage Brazil Signs on with Helm

Helm Operations has signed on Brazilian harbor services company SAAM SMIT Towage to its Helm Marine Operations software to manage its billing and dispatch.    SAAM

Siemens Wins Vessel Electrical Installation Contract

Nautilus Minerals Inc. announces that the order for the supply of the entire electrical installation for the production support vessel has been awarded to Siemens International Trading (Shanghai) Ltd.

Delivery Begins for HMS Prince of Wales Bridge

The bridge section of the U.K.’s second Queen Elizabeth Class aircraft carrier has been loaded out of its dock hall in Glasgow ahead of its first sea voyage to Rosyth.

Coast Guard

Bulk Carrier Grounds in St. Lawrence Seaway

A 621-foot bulk carrier ran aground near Wellesley Island in the St. Lawrence River, Monday. The U.S. Coast Guard (USCG) is responding.   The Bahamian-flagged

Shipwrecked Bodies Brought Ashore, EU Proposes Doubling Rescue Effort

The European Union proposed doubling the size of its Mediterranean search and rescue operations on Monday, as the first bodies were brought ashore of some 900 people

IMO SG Calls for Urgent Action to Safeguard Migrants

International Maritime Organization (IMO) Secretary-General, Koji Sekimizu, today called for coordinated action to safeguard migrants, following the most recent

Vessels

Delivery Begins for HMS Prince of Wales Bridge

The bridge section of the U.K.’s second Queen Elizabeth Class aircraft carrier has been loaded out of its dock hall in Glasgow ahead of its first sea voyage to Rosyth.

Vane Brothers Welcomes Latest Tug Newbuild

The Vane Brothers Company, a marine transportation provider headquartered in Baltimore, has taken delivery of Kings Point, the latest in a wave of Maryland-built tugboats.

First Ocean Vessel of 2015 Arrives at Port of Indiana

Northwest Indiana celebrates opening of gateway to global markets   The arrival of the 655-foot bulk carrier M/V Irma at the Port of Indiana-Burns Harbor signals

Great Lakes

First Ocean Vessel of 2015 Arrives at Port of Indiana

Northwest Indiana celebrates opening of gateway to global markets   The arrival of the 655-foot bulk carrier M/V Irma at the Port of Indiana-Burns Harbor signals

Bulk Carrier Grounds in St. Lawrence Seaway

A 621-foot bulk carrier ran aground near Wellesley Island in the St. Lawrence River, Monday. The U.S. Coast Guard (USCG) is responding.   The Bahamian-flagged

Mount Vernon Port Breaks Indiana Shipping Record

The Port of Indiana-Mount Vernon recorded the highest quarterly shipments by any port in Ports of Indiana's over 50-plus year history during the first quarter of 2015.

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Salvage Ship Repair Ship Simulators
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1206 sec (8 req/sec)