Engineers Put Next-Generation U.S. Navy Ships to the Test

MarineLink.com
Thursday, May 30, 2013
Naval Surface Warfare Center Carderock Division's (NSWCCD) Lawrence Snyder, naval architect; and Ben Ridenour, mechanical engineer; check on the Ship-to-Shore Connector (SSC) model connected underneath Carriage Two between tests in the David Taylor Model Basin, April 22 - May 17. (U.S. Navy photo by Monica McCoy)

Naval Surface Warfare Center Carderock Division (NSWCCD) engineers conducted preliminary Ship to Shore Connector (SSC) seaworthiness model tests in the David Taylor Model Basin, April 22 - May 17.


SSC is the replacement for the Navy's existing fleet of Landing Craft, Air Cushion (LCAC) vehicles, which are nearing the end of their service life.  SSCs - like the LCACs they replace - will be primarily used to haul vehicles, heavy equipment, and supplies through varied environmental conditions from amphibious ships to over the beach.

"All new Navy platforms, such as the SSC, are required to undergo a comprehensive Test and Evaluation program to assess technical and operational performance prior to full-scale production. This allows the Navy to resolve any potential problems prior to deployment," said Gerald Lawler, NSWCCD Senior Vulnerability Analyst.   "A platform's performance - with respect to survivability - typically falls under the responsibility of the Live Fire Test & Evaluation [LFT&E] program for the system.  For SSC, we're leading a multi-year effort to assess the craft's survivability, and just completed testing on one of the craft's Key Performance Parameters, or KPPs."
Carderock's David Taylor Model Basin building is 3,200 ft. long; houses high-speed- and deep-water-basins; and uses pneumatic wave makers.  The SSC model - using a skirt system developed by NSWC Panama City Division - was free to drift under a moving carriage in the basin, and moved through waves of different sizes.

"For the survivability KPP test, we created a set of target wave conditions and collected measurements as the model encountered these waves in a 'dead in the water' condition" said Larry Snyder, NSWCCD Naval Architect.  "Instrumentation was used to measure the motion and global loads. Pressure panels at select locations on the craft were used to measure the pressure due wave slap.  We'll compare the loads we measured in the basin to the design loads of the craft.  The data generated from this tests will help us extrapolate out to the anticipated lifetime of the craft and will aid in post-test numerical predictions."
By evaluating these requirements, the Navy can determine if craft will remain structurally adequate and mission capable in the "dead in the water" condition through its expected lifetime. 
"This seakeeping and survivability test was the third major test performed for the SSC LFT&E program.  Over the next several years, additional testing will be conducted to evaluate the craft's susceptibility, vulnerability, and recoverability to various threats," said Lawler.

The SSC Program requirement is for a total of 73 craft (one test and training, and 72 operational craft). Deliveries are expected to begin in fiscal year 2017, with initial operational capability projected for fiscal year 2020.
Research in ship design is tied to NSWCCD's technical capability in hull forms and fluid dynamics. Under this capability, NSWCCD provides the Navy's hydromechanics capability for surface and undersea platforms.  To learn more about the 132 technical capabilities across the NAVSEA Warfare Centers, visit:

http://www.navsea.navy.mil/Organization/WFC_TECHNICAL_CAPABILITIES_%20Rev4%20FINAL_01June2011.pdf 

Source: NSWCCD Public Affairs

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

U.S. Senators Urge Obama to Block Arctic Oil Drilling

A group of 18 mostly Democratic U.S. senators on Friday urged the Obama administration to stop Royal Dutch Shell's preparations for oil exploration in the Arctic,

Seaway to Receive Prestigious OECD Award

The St. Lawrence Seaway Management Corporation (SLSMC) announced today that it will receive a prestigious award from the Organization for Economic Cooperation

Torqeedo Introduces New Deep Blue Inboard

Torqeedo now offers a shaft drive version of its 40 and 80 horsepower Deep Blue motor. An electric drive designed for marine use from the ground up, the Deep Blue inboard shares the safety,

Shipbuilding

Alaska, Washington to build Arctic Icebreakers

Senator Lisa Murkowski, Alaska, and Senator Maria Cantwell, Washington, have introduced a bill that would authorize the Navy to build up six icebreakers for use by the U.

Launch of First Future Destroyer, Hobart

Speech delivered by the Minister for Defence, Kevin Andrews during the launch of Hobart - the first future destroyer: Thank you for being here on this very important day.

Fincantieri Invests In Camper & Nicholsons

Fincantieri has signed an agreement for the acquisition of a minority stake via capital injection in Camper & Nicholsons International (Camper & Nicholsons), the

Navy

Alaska, Washington to build Arctic Icebreakers

Senator Lisa Murkowski, Alaska, and Senator Maria Cantwell, Washington, have introduced a bill that would authorize the Navy to build up six icebreakers for use by the U.

Launch of First Future Destroyer, Hobart

Speech delivered by the Minister for Defence, Kevin Andrews during the launch of Hobart - the first future destroyer: Thank you for being here on this very important day.

Russian, Azerbaijani Navy to Hold First Ever Joint Drills in Caspian Sea

About 10 Russian and Azerbaijani ships will take part in a joint naval exercise in the Caspian Sea for the first time; RIA Novosti cited the statement of Russia’s Southern Military District.

Naval Architecture

Alaska, Washington to build Arctic Icebreakers

Senator Lisa Murkowski, Alaska, and Senator Maria Cantwell, Washington, have introduced a bill that would authorize the Navy to build up six icebreakers for use by the U.

China, Russia Conclude Naval Drill

Russia and China naval forces concluded their first-ever joint military exercise in the Mediterranean Sea this morning, according to an online news briefing from the Chinese Defense Ministry.

SSI to Showcase New Software at Nor-Shipping

SSI informs it will showcase the latest versions of its CAD/CAM software, ShipConstructor and EnterprisePlatform, at Nor-Shipping 2015, June 2-5. SSI CEO Darren

Eye on the Navy

Alaska, Washington to build Arctic Icebreakers

Senator Lisa Murkowski, Alaska, and Senator Maria Cantwell, Washington, have introduced a bill that would authorize the Navy to build up six icebreakers for use by the U.

Launch of First Future Destroyer, Hobart

Speech delivered by the Minister for Defence, Kevin Andrews during the launch of Hobart - the first future destroyer: Thank you for being here on this very important day.

Russian, Azerbaijani Navy to Hold First Ever Joint Drills in Caspian Sea

About 10 Russian and Azerbaijani ships will take part in a joint naval exercise in the Caspian Sea for the first time; RIA Novosti cited the statement of Russia’s Southern Military District.

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Pipelines Pod Propulsion Port Authority Ship Electronics Ship Repair Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1436 sec (7 req/sec)