Engineers Put Next-Generation U.S. Navy Ships to the Test

MarineLink.com
Thursday, May 30, 2013
Naval Surface Warfare Center Carderock Division's (NSWCCD) Lawrence Snyder, naval architect; and Ben Ridenour, mechanical engineer; check on the Ship-to-Shore Connector (SSC) model connected underneath Carriage Two between tests in the David Taylor Model Basin, April 22 - May 17. (U.S. Navy photo by Monica McCoy)

Naval Surface Warfare Center Carderock Division (NSWCCD) engineers conducted preliminary Ship to Shore Connector (SSC) seaworthiness model tests in the David Taylor Model Basin, April 22 - May 17.


SSC is the replacement for the Navy's existing fleet of Landing Craft, Air Cushion (LCAC) vehicles, which are nearing the end of their service life.  SSCs - like the LCACs they replace - will be primarily used to haul vehicles, heavy equipment, and supplies through varied environmental conditions from amphibious ships to over the beach.

"All new Navy platforms, such as the SSC, are required to undergo a comprehensive Test and Evaluation program to assess technical and operational performance prior to full-scale production. This allows the Navy to resolve any potential problems prior to deployment," said Gerald Lawler, NSWCCD Senior Vulnerability Analyst.   "A platform's performance - with respect to survivability - typically falls under the responsibility of the Live Fire Test & Evaluation [LFT&E] program for the system.  For SSC, we're leading a multi-year effort to assess the craft's survivability, and just completed testing on one of the craft's Key Performance Parameters, or KPPs."
Carderock's David Taylor Model Basin building is 3,200 ft. long; houses high-speed- and deep-water-basins; and uses pneumatic wave makers.  The SSC model - using a skirt system developed by NSWC Panama City Division - was free to drift under a moving carriage in the basin, and moved through waves of different sizes.

"For the survivability KPP test, we created a set of target wave conditions and collected measurements as the model encountered these waves in a 'dead in the water' condition" said Larry Snyder, NSWCCD Naval Architect.  "Instrumentation was used to measure the motion and global loads. Pressure panels at select locations on the craft were used to measure the pressure due wave slap.  We'll compare the loads we measured in the basin to the design loads of the craft.  The data generated from this tests will help us extrapolate out to the anticipated lifetime of the craft and will aid in post-test numerical predictions."
By evaluating these requirements, the Navy can determine if craft will remain structurally adequate and mission capable in the "dead in the water" condition through its expected lifetime. 
"This seakeeping and survivability test was the third major test performed for the SSC LFT&E program.  Over the next several years, additional testing will be conducted to evaluate the craft's susceptibility, vulnerability, and recoverability to various threats," said Lawler.

The SSC Program requirement is for a total of 73 craft (one test and training, and 72 operational craft). Deliveries are expected to begin in fiscal year 2017, with initial operational capability projected for fiscal year 2020.
Research in ship design is tied to NSWCCD's technical capability in hull forms and fluid dynamics. Under this capability, NSWCCD provides the Navy's hydromechanics capability for surface and undersea platforms.  To learn more about the 132 technical capabilities across the NAVSEA Warfare Centers, visit:

http://www.navsea.navy.mil/Organization/WFC_TECHNICAL_CAPABILITIES_%20Rev4%20FINAL_01June2011.pdf 

Source: NSWCCD Public Affairs

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter June 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

Denmark Adopts Digital Ship Certification

As of June 24, 2016, ships flying the Danish flag are being digitally certified, making Denmark one of the first countries to put an end to the 100-year-old tradition

Prince Charles Places Final Section of UK Aircraft Carrier

The second of the largest warships ever built for the U.K. Royal Navy, the Queen Elizabeth Class carrier HMS Prince of Wales, was given the royal seal of approval when HRH The Prince of Wales,

US Navy Accepts Delivery of Future USS Montgomery

The U.S. Navy has accepted delivery of future USS Montgomery (LCS 8) during a ceremony on June 23 at the Austal USA shipyard in Mobile, Ala.   Marking the official

Shipbuilding

Austal Delivers LCS 8 to US Navy

Austal Limited (Austal) (ASX:ASB) delivered the future USS Montgomery (LCS 8) to the U.S. Navy, during a ceremony held aboard the ship at Austal USA’s shipyard in Mobile, Alabama, USA on 23 June.

Conrad Shipyard Forms LNG Business Unit

Conrad Shipyard has formed a new business unit focused on LNG projects.   Conrad, builder of North America’s first LNG bunker barge scheduled for 2017 delivery,

Prince Charles Places Final Section of UK Aircraft Carrier

The second of the largest warships ever built for the U.K. Royal Navy, the Queen Elizabeth Class carrier HMS Prince of Wales, was given the royal seal of approval when HRH The Prince of Wales,

Navy

Blue Angels Resume Schedule

The U.S. Navy Blue Angels will return to its 2016 demonstration schedule July 2-4 in Traverse City, Mich., Commander, Naval Air Forces announced. The Blue Angels temporarily stood down,

HMS Ambush Docks in Gibraltar

Navy nuclear submarine HMS Ambush yesterday steamed to Gibraltar – in a massive show of force against Spain.   The Spanish – emboldened by Britain’s Brexit vote

Indonesia Bans Ships for Philippines

The Indonesian Government has banned vessels flying Indonesias flag from sailing to the Philippines following the latest hostage incident.   According to a report in AP,

Naval Architecture

Austal Delivers LCS 8 to US Navy

Austal Limited (Austal) (ASX:ASB) delivered the future USS Montgomery (LCS 8) to the U.S. Navy, during a ceremony held aboard the ship at Austal USA’s shipyard in Mobile, Alabama, USA on 23 June.

Conrad Shipyard Forms LNG Business Unit

Conrad Shipyard has formed a new business unit focused on LNG projects.   Conrad, builder of North America’s first LNG bunker barge scheduled for 2017 delivery,

RS Rules Conform to the IMO Goal-based Standards

The rules of the Russian Maritime Register of Shipping are in conformity to the International Maritime Organization (IMO)goal-based standards (GBS), the IMO’s Maritime

Eye on the Navy

Blue Angels Resume Schedule

The U.S. Navy Blue Angels will return to its 2016 demonstration schedule July 2-4 in Traverse City, Mich., Commander, Naval Air Forces announced. The Blue Angels temporarily stood down,

Austal Delivers LCS 8 to US Navy

Austal Limited (Austal) (ASX:ASB) delivered the future USS Montgomery (LCS 8) to the U.S. Navy, during a ceremony held aboard the ship at Austal USA’s shipyard in Mobile, Alabama, USA on 23 June.

Prince Charles Places Final Section of UK Aircraft Carrier

The second of the largest warships ever built for the U.K. Royal Navy, the Queen Elizabeth Class carrier HMS Prince of Wales, was given the royal seal of approval when HRH The Prince of Wales,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0069 sec (145 req/sec)