Offshore Liebherr Crane Can Raise 1,500 Tonnes

Press Release
Monday, October 08, 2012
Heavy-lift Ship 'Innovation': Photo credit Liebherr

First CAL 64000 heavy-lift offshore crane is ready for North Sea wind farm duty.

The first CAL 64000-1500 Litronic®, a heavy lift offshore crane developed by Liebherr-Werk Nenzing GmbH, is now ready for operation. The crane is installed on the Innovation, a vessel belonging to HGO InfraSea Solutions, which installs offshore wind power stations in the North Sea wind park Global Tech I.

With this new product Liebherr meets the increasing demand for high performing heavy lift.

The CAL 64000-1500 Litronic® achieves a maximum lifting capacity of 1,500 t at a maximum working radius of 31.5 m. It is designed as “Crane Around the Leg”, which means that the heavy lift crane is able to rotate 360° around one of the four jack-up legs of the vessel. The CAL 64000 is the first heavy lift offshore crane in the world to date to be built according to this design whose main advantage is that despite the crane’s enormous size it can be positioned in a space-saving way and thus requires a relatively small obstruction area of only 12 m.






 

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

Fraunhofer Researchers Improve Underwater Images

Videos and images of the submarine world are important for the maritime industry. Researchers from Fraunhofer IGD will show how underwater images can be improved

NavStation to Launch at SMM

Touch screen technology has transformed everyday life and now, thanks to Norwegian e-navigation specialist NAVTOR, it is set to revolutionize operations onboard busy vessel bridges.

SENER Announces the FORAN V70R3.0

SENER announces the new FORAN V70R3.0, available from July 31, 2014. With more than 45 years in the market, FORAN takes advantage of SENER´s innovative development

Shipbuilding

ClassNK Head Attends KOTC Delivery Ceremony

Noboru Ueda, Chairman and President of ClassNK attended the delivery ceremony for the M/T Al Yarmouk, constructed at Daewoo Shipbuilding & Marine Engineering Co.

Vard Orders Parat Electric Steam & Hot Water Boilers

During the last month, PARAT Halvorsen AS has collected four new boiler plant orders from the Vard Group and their multipurpose platform ships of Vard 1 08 design.

N-KOM Lays Keel for Qatar’s First Liftboat

Nakilat-Keppel Offshore & Marine (N-KOM) has achieved another milestone with the keel laying of its first liftboat newbuild project, awarded in July 2014 by long-time

Offshore

N-KOM Lays Keel for Qatar’s First Liftboat

Nakilat-Keppel Offshore & Marine (N-KOM) has achieved another milestone with the keel laying of its first liftboat newbuild project, awarded in July 2014 by long-time

Master Fined After Wind Farm Collision

The master of a wind farm support vessel has today been made to pay £3,000 in fines and costs after pleading guilty to breaches of maritime collision regulations.

Bureau Veritas Diversifies with MatthewsDaniel Acquisition

Bureau Veritas announced today that it has acquired MatthewsDaniel Ltd, a global provider of loss adjusting and risk assessment services for the offshore industry.

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Offshore Oil Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1278 sec (8 req/sec)