BMT Wins Petrobras Cascade & Chinook Contract

Wednesday, August 17, 2011
BMT Engineer prepares Free-Standing Hybrid Riser (FSHR) data acquisition modules to go subsea.

BMT Scientific Marine Services (BMT) was contracted by Petrobras America Inc., a subsidiary of Petrobras, to provide support maintenance and repair for the Cascade and Chinook Free Standing Hybrid Riser Tower (FSHR) Monitoring System.
This agreement includes five years of operation to support maintenance and repair of the FSHR monitoring system, including equipment replacement, change-out of batteries, repair of equipment, preventative maintenance, equipment refurbishment, freight and transport.
The monitoring system was originally supplied by BMT with subsea installation completed in 2010. It was designed to monitor the stabilizing uplift forces on five Riser Towers and record Riser, Turret Buoy and FPSO position, motion and mooring data.
The BMT Service Team has provided service to platforms and vessels around the world that utilize its monitoring and control systems. BMT offers pro-active maintenance, unscheduled or emergency service visits, remote support, and both onsite and shore-based training. 

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

Maritime Reporter @ 75: The Daily Cartoon

Maritime Reporter & Engineering News was founded by John J. O'Malley (1905-1980) in 1939, and today ranks as the world's largest audited trade publication in the world serving the maritime industry,

Video: Reefer RoRo Ship Design Rebooted

Expanding on the Reefer RoRo Ship design release in September last year, naval architects group Knud E. Hansen A/S has continued the development of the new Reefer RoRo Ship design with version II.

Contracts

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

President Pryor Retires from ExxonMobil Chemicals

Stephen D. Pryor, president, ExxonMobil Chemical Company and vice president of Exxon Mobil Corporation, has elected to retire on January 1, 2015, after more than 44 years of service.

Asia Tanker, VLCC Rates Could Climb

Charterers to release 30 Middle East VLCC cargoes next week. VLCC market buoyed by upbeat Suezmax, Aframax sectors. Rates for very large crude carriers (VLCCs)

Offshore

7 Rescued from Sinking Freighter Near Haiti

Seven crewmembers were rescued after their 100-foot coastal freighter began taking on water and sank approximately 45 miles north off of Cap Haitien, Haiti, Friday.

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

China Building Island Big Enough for Airstrip

Satellite images show China is building an island on a reef in the disputed Spratly Islands large enough to accommodate what could be its first offshore airstrip in the South China Sea,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Ship Repair Ship Simulators
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1257 sec (8 req/sec)