Update: BOEMRE Response to Natural Gas Leak in GOM

Thursday, January 27, 2011

The Bureau of Ocean Energy Management, Regulation and Enforcement (BOEMRE) is continuing to oversee Apache Corp.’s source control efforts for a natural gas leak near East Cameron Block 278 Platform B. The platform is located approximately 93 miles offshore Louisiana, south of Lake Charles, in about 173 feet of water. The platform, which has not been in production for nearly a decade, is currently used to process natural gas and condensate from other facilities.

With BOEMRE’s approval and after several safety system evaluations, Apache personnel re-boarded the platform January 19 and began work to kill the leaking well.  BOEMRE engineers reviewed and approved the well control procedures to be used from the platform.  A remotely operated vehicle (ROV) is continuously monitoring well site conditions to ensure that the work can proceed safely.

Well control procedures from the platform have significantly reduced the amount of natural gas flowing from the well. Once Apache has confirmation that the source of the leak is under control, work to permanently plug the well will begin. BOEMRE is reviewing the plugging procedures.

In accordance with BOEMRE’s direction, Apache moved a jack-up rig, Hercules 200, on location January 23 to drill a relief well in the event that the source control procedures from the platform are not successful.  The rig is currently installing structural casing, the preliminary step in preparing the area for drilling.

A BOEMRE Lake Charles District engineer initially received the report of a potential leak on January 16, at approximately 10 a.m. According to Apache’s report, the operator was in the process of permanently plugging its associated non-producing natural gas wells when workers spotted what appeared to be natural gas bubbling to the surface near the platform.  The platform was safely evacuated and the associated pipelines and facilities have been successfully shut in.

BOEMRE inspectors confirmed the bubbling and discolored water initially found near the platform has significantly decreased. The discolored water may be a mixture of sediment from the ocean floor, gas, and formation water.  Oil is not believed to be present other than in small amounts of condensate, which quickly evaporates. 

BOEMRE has notified other agencies and is continuing to closely oversee the situation. BOEMRE will also conduct an investigation of the incident.
 

Email AddThis Feed Button
Maritime Reporter May 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Casualties

Coast Guard Evacuate 78 From Blazing Fishing Vessel

Crewmembers aboard the 314-ft fishing vessel 'Arctic Storm' extinguised an engine-room fire using the ship's Halon chemical firefighting system. The Coast Guard

Costa Concordia: Board Members Under Investigation

Five board members of owners, Costa Crociere, have been placed under investigation in connection with the January 2012 cruise ship accident. The executives are

Passenger Ship Grounded off Scotland Coast

The passenger ship 'Serenissima' grounded Monday night in Oban Bay, was refloated the next day & awaits underwater inspection. The UK Maritime and Coastguard Agency

Government Update

Putin Urges Naval Shipbuilders to Expedite Deliveries

The United Shipbuilding Corporation (USC), is under criticism from Russian President Vladimir Putin for delays in delivery of several warships for the Russian Navy, RIA Novosti reported.

Australian Reef Protected by New Safety Initiative

To protect the World Heritage-listed Ningaloo Coast in Western Australia’s north-west region, the Australian Maritime Safety Authority (AMSA) to establish an area ships should avoid.

Maritime London Delegation to Head for Athens

Maritime London will be leading a delegation of British maritime professionals to Athens, Greece, next month. The high level group will present to an audience

 
 
mobi | rss feeds | archive | history | articles | privacy | contributors | top news | about us | copyright