Rolls-Royce Wins $69m OSV Contract

Marinelink
Friday, March 30, 2012
Rolls-Royce won a $69m order to design and equip two advanced offshore anchor handling vessels for Norwegian ship owner Farstad Shipping. The UT 731 CD vessels are designed and equipped to handle anchors for oil rigs, tow rigs to location and also serve as supply vessels. They can operate in extreme climatic conditions and ultra deep waters, undertaking precise rig manoeuvring operations in water up to 3,000m deep. They are also equipped for sub sea construction and installation duties. Each vessel will feature a fully integrated equipment system from Rolls-Royce including deck machinery and vessel control systems.  They will also include diesel electric hybrid propulsion systems to reduce the total fuel burn and cut CO2 emissions.
“Rolls-Royce has a close working relationship with both Farstad Shipping and STX OSV," said Anders Almestad, Rolls-Royce, President - Offshore. "These customers’ repeated choice of our market leading technology highlights the value Rolls-Royce delivers and the Group’s ability to design and equip robust, highly advanced offshore vessels that deliver optimal results for their owners and operators.” 
Both vessels will be built at the STX OSV Langsten yard in Norway and are scheduled for delivery in the first half of 2014. Farstad Shipping has now ordered eight vessels of this type. Each of the vessels will have a deck cargo area of about 760 sq. m. and the gross tonnage is approximately 6100 GT. The bollard pull is around 260 tons and installed power is approximately 24000 BHP.
 
 
 
 
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

VT Halter Begins Building LNG-powered ConRo Ships for Crowley

VT Halter Marine, Inc., a subsidiary of Vision Technologies Systems, Inc. (VT Systems), has commenced construction on the first of two liquefied natural gas (LNG)-powered,

New Research Vessel Delivered on the Great Lakes

The new oceanographic research and fisheries assessment vessel, Arcticus, completed her sea trials and was delivered to the U.S. Geological Survey's Great Lakes Science Center on October 17.

US Navy Christens Future USS Detroit

The U.S. Navy christened the future USS Detroit (LCS 7), the fourth Littoral Combat Ship of the Freedom variant, in a ceremony at Marinette Marine Shipyard in Marinette, Wisconsin, Oct.

Offshore

Renewable Energy: Schottel Tidal Turbines Ready For Use

In the last months Schottel  successfully tested its hydrokinetic turbines in Strangford Lough, Northern Ireland. The full-scale tests included 260 operating hours under realistic conditions.

Total CEO Killed in Moscow Runway Accident

Private jet collided with snow plow during takeoff; Total's CEO a defender of Moscow policies. Insiders Boisseau and Pouyanne long seen as potential successors.

Statoil: New Oil in the Grane Area

Statoil has together with PL169 partners proved new oil resources in the D-structure in the vicinity of the Grane field in the North Sea.   Well 25/8-18 S, drilled by the rig Transocean Leader,

Deck Machinery

SOSI Delivers Mooring Winches; Completes Test Pad

Sound Ocean Systems, Inc. (SOSI) announced the delivery of two unique mooring winches, both tested on its newly constructed test pad at its primary manufacturing facility in Sultan, Wash.

Barge Master Installed on Walk-To-Work Vessel

On October 14 the Barge Master BM-T40 system motion-compensated knuckle boom crane pedestal was installed on the new Wagenborg Walk-to-Work vessel, designed and built by Royal Niestern Sander.

 
 
Maritime Contracts Maritime Security Naval Architecture Pipelines Port Authority Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2501 sec (4 req/sec)