Solstad Ships Dock at Gibdock

Monday, June 13, 2011

Norway’s Solstad Offshore has returned to Gibdock for the conversion and drydocking of the 84m long, 4500 dwt Platform Support Vessel Normand Vester. This follows the conversion of the Normand Trym and Normand Vibran at the Gibraltar yard, successfully completed for the same owner last year.

While the Normand Vester project is similar in scope to these earlier conversions, there are some differences. In this case, the fresh water capacity is being increased by converting two of the stability tanks from water ballast to fresh water, while eight mud tanks are being converted for increased fuel oil capacity. Furthermore, two wing tanks are being converted to void spaces due to the conversion of the stability tanks.

This work is necessary to prepare the vessel for a new role, under a four year charter that Solstad has recently agreed with Petrobras of Brazil. This contract requires that the vessel is able to supply offshore units with 1600m3 of potable water and 1600m3 of fuel oil.

Malcolm Rosie, Technical Director, Solstad Offshore (UK)  says: “Gibdock was chosen to carry out this work as they offered a very positive attitude to the project, were in a good location en route to Brazil and offered competitive rates.  Gibdock also delivered excellent results with the Vibran and Trym conversions in 2010.”

Another Solstad ship, the 127m long 9500 dwt offshore construction vessel Normand Cutter, also docked at Gibdock in April this year, having been operating in West Africa. On this occasion the yard was required to dock the vessel for its second class renewal. In addition to general survey requirements, Gibdock carried out thruster, crane and general repair work.

Gibdock Commercial Manager Richard Beards says: “It is a tribute to the capabilities of the yard and our staff that Solstad keeps coming back and these latest dockings underline the close partnership that has been built up between us. They are a major quality player and we are honoured that they continue to have such confidence in us.”
 

Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Meyer Turku Wins TUI Cruises Order for 2 Ships

TUI Cruises GmbH and Meyer Turku Oy signed an agreement for two cruise ships. This order further strengthens the order book of the shipyard, which contains now a high work load until the year 2020.

Oranjewerf Ship Repair becomes Damen Shiprepair Oranjewerf

On 1 July 2015, Oranjewerf Ship Repair, which joined Damen Shipyards Group in 1989, will officially change its name to Damen Shiprepair Oranjewerf. This name

Shell Steps Closer to Arctic Drilling

The U.S. Fish and Wildlife Service authorized the nonlethal, incidental, and unintentional take of small numbers of polar bears and Pacific walrus that result

Offshore

Cargoship Disabled and Grounded in Dardanelles

General cargo vessel Ibrahim Konan  (7,618 dwt, built 2008) today (July 1) suffered rudder failure and ran aground in Dardanelles in front of Eceabat in Turkey,

Motion Compensation Solution for Solan Field

Ampelmann provides access solution for commissioning of the Solan project in West of Shetland   Motion compensated access solutions developer Ampelmann informs

US Issues Potential Setback to Shell's Arctic Drilling

The Obama administration issued a potential setback to Royal Dutch Shell's  Arctic oil exploration plans on Tuesday, telling the company that established wildlife

Vessels

Meyer Turku Wins TUI Cruises Order for 2 Ships

TUI Cruises GmbH and Meyer Turku Oy signed an agreement for two cruise ships. This order further strengthens the order book of the shipyard, which contains now a high work load until the year 2020.

Samsung Bags $4.7bn Order for 3 FLNG from Shell Gas

South Korean shipbuilder Samsung Heavy Industries Co. as won a 5.2 trillion won (US$4.7 billion) order to build three floating liquefied natural gas (FLNG) facilities, reports Yonhap.

Cargoship Disabled and Grounded in Dardanelles

General cargo vessel Ibrahim Konan  (7,618 dwt, built 2008) today (July 1) suffered rudder failure and ran aground in Dardanelles in front of Eceabat in Turkey,

 
 
Maritime Contracts Maritime Security Navigation Pipelines Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2219 sec (5 req/sec)