Baltic Wind Success Paves Way for Ecosse Subsea Systems

MarineLink.com
Wednesday, September 25, 2013
Preparing the SCAR subsea plough for deployment.

Ecosse Subsea Systems (ESS) has completed a £4.7 million boulder clearing and pre-lay trenching project which it claims has been one of the most successful ever conducted for the wind energy sector.

As subcontractor to Siem Offshore Contractors (SOC), the Banchory-based subsea specialist completed 86 boulder clearing passes followed by 172 first and multi-passes over a 90km route during a 13-week boulder clearing and trenching campaign on the EnBW Baltic 2 offshore wind farm project.

The project was on schedule and on budget and now ESS is looking to secure a frame agreement with SOC for similar works on renewables schemes across Europe.

Several thousand boulders ranging up to 4m in size were cleared from the individual cable routes and ESS performed 260 individual route passes in varying and sometimes challenging soil conditions.

ESS managing director, Mike Wilson, said: “We created a lot of firsts on EnBW Baltic 2. It was our largest contract to date, our first non-U.K. trenching workscope and our first project for a German offshore wind farm project.

“It couldn’t have gone better and our client is now convinced that our zero-risk pre-trenching option – where the hard work is done before the cable is present – is the future for cable installation.”

Mobilization on the 86 cable route workscope started in Gdansk, Poland, with ESS transporting its SCAR ploughing technology by road from Aberdeen.

Installation onboard of the SOC operated DP-2 anchor handling tug and supply vessel AHTS Siem Topaz, including a combined  ROV and survey spread, took 48 hours with demobilisation taking place in Sassnitz, Germany, and being completed in only 12 hours.

ESS deployed a seven-man trenching crew plus a 10-man ROV and survey personnel, a huge reduction on the 40-strong teams typically used by other cable trenching companies.

Mr. Wilson added, “Our technology and equipment was easily adaptable for use on the SOC operated vessel and having our own ROV and survey spreads meant we were able to provide a completely integrated solution.

“Performing trenching before the cable is present removes any risk of cable damage and means we can work faster and use more powerful machinery. Meeting the schedule is hugely important to the client in terms of cost and also brings environmental savings.

“We are hopeful that following the success of EnBW Baltic 2 that we will secure a frame agreement for boulder clearing and pre-lay trenching  services for Siem Offshore Contractors, who are tendering on a range of renewables schemes.”

EnBW Baltic 2 is an 80 turbine development located 32km north of Rügen island in the German exclusive economic zone of the Baltic Sea and owned by the German utility company EnBW. The 27km² site spans water depths ranging from 20m to 45m LAT and has a wide array of soil conditions from fine sands to glacial tilt with areas of gravels and cobbles with numerous boulders.

 

  • Ecosse Subsea Systems managing director, Mike Wilson, with the SCAR subsea plough.

    Ecosse Subsea Systems managing director, Mike Wilson, with the SCAR subsea plough.

  • Mike Wilson, managing director of Ecosse Subsea Systems.

    Mike Wilson, managing director of Ecosse Subsea Systems.

  • Preparing the SCAR subsea plough for deployment.

    Preparing the SCAR subsea plough for deployment.

  • Ecosse Subsea Systems managing director, Mike Wilson, with the SCAR subsea plough.
  • Mike Wilson, managing director of Ecosse Subsea Systems.
  • Preparing the SCAR subsea plough for deployment.
Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

NewLead Expands Fleet to 10 Vessels

NewLead Holdings Ltd. announced that it recently added five bitumen tanker vessels, expanding its fleet to 10 vessels in less than a year while performing on its

SKF Expands Electric Motor Repair Network

Electric motors are among the highest in reliability incident reports, said SKF Canada, noting that for many companies, electric motor failures lead to a continual

‘Landmark Year’ for RS in 2014

For Russian Maritime Register of Shipping (RS), 2014 marked the 101st year of its activities. The classification society said 2014 also marked a landmark year,

Technology

‘Landmark Year’ for RS in 2014

For Russian Maritime Register of Shipping (RS), 2014 marked the 101st year of its activities. The classification society said 2014 also marked a landmark year,

Partnership Targets Waste Conversion Solutions

Terragon Environmental Technologies Inc. has entered into a strategic partnership with Green Marine Capital (GMC) in an effort to enable off grid sustainability

CakeBoxx, Globe Tracker Partner for Asset Tracking

Globe Tracker International, a company in global autonomous asset tracking, monitoring, remote management and data sharing services, and CakeBoxx Technologies,

News

US Proposes Allowing Oil, Gas Drilling off Atlantic Coast

The Obama administration on Tuesday proposed allowing for the first time oil and gas exploration in a wide swath of U.S. waters off the Atlantic Coast.   The

NewLead Expands Fleet to 10 Vessels

NewLead Holdings Ltd. announced that it recently added five bitumen tanker vessels, expanding its fleet to 10 vessels in less than a year while performing on its

SKF Expands Electric Motor Repair Network

Electric motors are among the highest in reliability incident reports, said SKF Canada, noting that for many companies, electric motor failures lead to a continual

Wind Power

Boost for Offshore Wind Energy

As part of President Obama’s Climate Action Plan to create American jobs, develop domestic clean energy resources and cut carbon pollution, Secretary of the Interior

Infigen Energy Mulls Shedding U.S. Wind Farms

Australia under pressure to fix renewable energy target deadlock; 45 wind farm projects stalled. Australian wind farm operator Infigen Energy Ltd is exploring the sale of 18 U.

Offshore Energy

US Proposes Allowing Oil, Gas Drilling off Atlantic Coast

The Obama administration on Tuesday proposed allowing for the first time oil and gas exploration in a wide swath of U.S. waters off the Atlantic Coast.   The

NOIA: Draft Offshore Lease Program Both Hits and Misses

National Ocean Industries Association (NOIA) President Randall Luthi issued a statement on the 2017-2022 Draft Proposed OCS Oil and Gas Leasing Program, stating the U.

World's Largest Ship Sparks Outrage

Jewish groups in the Netherlands and Britain have reacted with rage and despair at the arrival in Rotterdam of the world's biggest ship, the Pieter Schelte, named

Underwater Engineering

InterMoor Completes Juniper Mooring Installation Contract

InterMoor has completed a mooring and foundation installation campaign for bpTT’s Juniper gas project offshore Trinidad and Tobago, reportedly the largest foundation

Hofste, Montijn Nominated to Supervisory Board Fugro

Fugro N.V. announces that the Supervisory Board of Fugro nominates Mrs. P.H.M. Hofsté and Mrs. A.H. Montijn for appointment as members of the Supervisory Board

Subsea Crane Takes a Long Journey

Last September the test bed in Rostock was the stage of a single lift of the RL-K 7500 subsea crane. The same crane was then loaded and shipped to the South Korean customer.

 
 
Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.6221 sec (2 req/sec)