Washington State Ferry System Reform Action Plan

Friday, November 19, 2010

Washington State Ferries (WSF) said it will work to implement a majority of 36 recommendations made by an independent panel to improve ferry operations.

Changes will come in ferry management, vessel and terminal maintenance, finance, scheduling, labor and customer service, according to an action plan the Ferries Division of the Washington State Department of Transportation submitted to Gov. Chris Gregoire.

“We have a world-class ferry system that provides marine highways throughout the Puget Sound region that are vital to our economy and our way of life,” Transportation Secretary Paula Hammond said. “We welcome these recommendations, some of which offer significant opportunities to reshape how WSF operates.”

In March, Gov. Gregoire asked the Passenger Vessel Association (PVA) to conduct a review of how well WSF has implemented changes recommended by past system reviews and audits, and to make further recommendations for efficiency improvements. The PVA is the leading national organization for public and private ferry and other passenger-vessel agencies and businesses. A national expert review panel met six times this summer to review WSF and complete a report.

“We understand that implementing the recommendations will require significant changes to the way we do business,” said David Moseley, assistant secretary for WSF. “Some of them will require changes in legislation, and some will require extensive discussions with our bargaining units. We’re ready to move forward with the hard work ahead of us.”

In a response and action plan presented to the Governor’s Office, Moseley said WSF will work to implement the majority of the recommendations, including:
•         Making vessel captains management’s representative on the ferries.
•         Improving accident- and injury-prevention measures for passengers and crews.
•         Improving ways to measure success in areas such as customer satisfaction, on-time performance, and cost efficiency.
•         Ensuring that staffing on the vessels is appropriate for the number of passengers being carried.
•         Imposing a systemwide, two-minute loading cut-off before sailings.
•         Requiring staff to meet new customer-service standards.

Some recommendations which will require further analysis include:
•    Changing from a state-run agency to a different type of governance.
•    Consolidating and expediting shipyard work to reduce vessel out-of-service time.
•    Using pricing or other strategies to manage demand, such as peak-period pricing or off-peak discounts.

Moseley said WSF does not concur with a few of the recommendations, including:
•    Reducing the staff hours of the engine-room crew. It is more cost-effective to have engine-room crews perform vessel maintenance and repairs during evening tie-ups than dispatching crews from WSF’s Eagle Harbor Maintenance Facility to do that work or bringing the vessels to Eagle Harbor.
•    Adding a second and third shift at Eagle Harbor to perform vessel maintenance and repairs. WSF has examined this option in the past and determined that it is not feasible, effective or financially beneficial, given issues such as the wide geographic distribution of the system and noise ordinances on Bainbridge Island (where Eagle Harbor is located).

The Governor’s Office will review the report and may provide further direction to WSF.

 

Maritime Reporter August 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Passenger Vessels

MN 100: Elliott Bay Design Group

The Company: Elliott Bay Design Group (EBDG) is a Seattle-based, employee-owned enterprise with offices in New Orleans and Ketchikan that provides full-service naval architecture,

MSC Cruise to Homeport in China

MSC Cruises has announced that the MSC Lirica will homeport in Shanghai to serve the Chinese cruise market, through a strategic partnership with CAISSA Touristic Group.

Historic Steamship Towed to Buffalo for Restoration

A 113-year-old “Boblo Boat” SS Columbia is being towed from Toledo, Ohio to Buffalo, N.Y., where the historic vessel will be docked for the next year for restoration.

Government Update

Willard to Supply Patrol Boats for the Philippines

The U.S. Department of State awarded a contract to boatbuilder Willard Marine, Inc., to provide the Philippine National Police Maritime Group with patrol vessels

Libya Plans to Sell Ex-rebel Tanker

Libya plans to sell a tanker that a former rebel group used in an attempt to bypass the Libyan government and export oil on its own last year, the Tripoli-based state prosecutor said on Thursday.

Former CIA Spy Ship Becomes Victim of Oil Slump

A ship built by the CIA for a secret Cold War mission in 1974 to raise a sunken Soviet sub is heading to the scrap yard, a victim of the slide in oil prices.   Christened the Hughes Glomar Explorer,

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Navigation Pipelines Port Authority Salvage Ship Electronics Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1253 sec (8 req/sec)