Wellhead Plugging Attempts Underway

Friday, May 28, 2010

The mobile offshore drilling unit Q4000 holds position directly over the damaged Deepwater Horizon blowout preventer as crews work to plug the wellhead using a technique known as "top kill," May 26, 2010. The procedure is intended to stem the flow of oil and gas and ultimately kill the well by injecting heavy drilling fluids through the blow out preventer on the seabed down into the well. A nearby vessel sprays sea water near the surface of Q4000 to keep oil and fumes from interfering with operations. (U.S. Coast Guard photo by Petty Officer 3rd Class Patrick Kelley)

Maritime Today

The Maritime Industry's original and most viewed E-News Service

Maritime Reporter November 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


Henriksen Unveils Strongest SOLAS Boat Lifting Hook

H Henriksen of Norway has received SOLAS certification for a new off-load single-point boat lifting hook capable of holding up to 22.5-tonnes. The quick release

S&P Raises Steamship Mutual outlook to Positive

Poor’s has revised its outlook on Steamship Mutual to Positive from Stable. The A- financial strength rating has been reaffirmed. In their announcement Standard

SSA Welcomes Decision To Extend BEO

The Singapore Shipping Association (SSA) has welcomed the decision by Singapore’s Minister for Trade and Industry to extend the Competition (Block Exemption

Maritime Security Maritime Standards Naval Architecture Offshore Oil Pipelines Pod Propulsion Ship Electronics Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0808 sec (12 req/sec)