Wellhead Plugging Attempts Underway

Friday, May 28, 2010

The mobile offshore drilling unit Q4000 holds position directly over the damaged Deepwater Horizon blowout preventer as crews work to plug the wellhead using a technique known as "top kill," May 26, 2010. The procedure is intended to stem the flow of oil and gas and ultimately kill the well by injecting heavy drilling fluids through the blow out preventer on the seabed down into the well. A nearby vessel sprays sea water near the surface of Q4000 to keep oil and fumes from interfering with operations. (U.S. Coast Guard photo by Petty Officer 3rd Class Patrick Kelley)
 

Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

News

5th Floating Accommodation for Lerwick

A further accommodation ship, Ocean Atlantic, is due at Lerwick on Monday 27 April 2015 and is on its way from Portland in Dorset. As with the other floating accommodation at the port,

Double Order for Super Gloria Reachstacker

Kalmar, part of Cargotec, has gained an order for two Super Gloria reachstackers from Tadarsa Logistics S.L. in Aviles, Spain. The largest reachstackers ever built,

Goliat FPSO in Norway

The Goliat FPSO was successfully floated off the heavy-lift vessel, Dockwise Vanguard, in the fjord outside Hammerfest, says Eni Norge    The Goliat platform has arrived in Hammerfest,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Naval Architecture Navigation Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1533 sec (7 req/sec)