Wellhead Plugging Attempts Underway

Friday, May 28, 2010

The mobile offshore drilling unit Q4000 holds position directly over the damaged Deepwater Horizon blowout preventer as crews work to plug the wellhead using a technique known as "top kill," May 26, 2010. The procedure is intended to stem the flow of oil and gas and ultimately kill the well by injecting heavy drilling fluids through the blow out preventer on the seabed down into the well. A nearby vessel sprays sea water near the surface of Q4000 to keep oil and fumes from interfering with operations. (U.S. Coast Guard photo by Petty Officer 3rd Class Patrick Kelley)

Maritime Reporter September 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


Historic Pacific Trade Deal Faces Skeptics in US Congress

Twelve Pacific Rim countries on Monday reached the most ambitious trade pact in a generation, aiming to liberalize commerce in 40 percent of the world's economy in a deal that faces skepticism from U.

Supramx Ship Delivered to Seanergy

Dry Bulk shipping company Seanergy Maritime Holdings Corp. announced today the delivery of a 56,819 dwt Supramax dry bulk vessel, renamed M/V Gladiatorship.   The vessel,

Danelec Marine Expands in Brazil

Press release - Danelec Marine has announced that it is expanding its presence in Brazil by naming Telnav Telecomuniçacões Navais a Certified Service Center. With

Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Offshore Oil Port Authority Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2444 sec (4 req/sec)