Wellhead Plugging Attempts Underway

Friday, May 28, 2010

The mobile offshore drilling unit Q4000 holds position directly over the damaged Deepwater Horizon blowout preventer as crews work to plug the wellhead using a technique known as "top kill," May 26, 2010. The procedure is intended to stem the flow of oil and gas and ultimately kill the well by injecting heavy drilling fluids through the blow out preventer on the seabed down into the well. A nearby vessel sprays sea water near the surface of Q4000 to keep oil and fumes from interfering with operations. (U.S. Coast Guard photo by Petty Officer 3rd Class Patrick Kelley)
 

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

News

Two MCS Exhaust Gas Boilers to Tersan Shipyard

Parat Halvorsen AS has been awarded new boiler plant contracts for two freezer trawlers to be built at Tersan Shipyard located in Telova, Turkey. The boiler plants are for Tersan¹s newbuildings No.

Halliburton to Settle US Gulf Spill Claims for $1.1b

Halliburton Co said it reached a $1.1 billion settlement for a majority of claims against the company for its role in the BP oil spill in the Gulf of Mexico in 2010.

RDS Wins Engineering and Design Contract for Sea Lion

Rig design and engineering specialist RDS has been awarded a front-end engineering design (FEED) contract by AMEC for Premier Oil’s Sea Lion development in the North Falklands Basin.

 
 
Maritime Security Maritime Standards Naval Architecture Offshore Oil Pipelines Port Authority Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1489 sec (7 req/sec)