Damaged Pipeline Recovered

Thursday, August 18, 2005
Upon completion of the second successful pipelay, 22,000’ x 6” in the Ship Shoal area, BISSO MARINE pipeline division reconfigured the DLB BIG CHIEF to recover 14,000’ of 20” pipeline in the Main Pass area. The 20” pipeline, which was crossed by three trunklines, had been uncovered, kinked and moved about during Hurricane Ivan, leaving the line in a condition which prevented any opportunity to pig the pipeline prior to the removal. Due to the pipeline being “hot”, BISSO MARINE devised a plan to pull the pipeline onto the barge’s “recovery line”, purge and cold cut. The cut piece of pipeline was then encapsulated and placed onto the materials barge for transport to a facility for cleaning and disposal. The customization of the DLB BIG CHIEF included the fabrication of a large pollution containment area; a heavy duty frame to support the hydraulic cutting machine and heavy wall pipe rollers to support the pipeline while on deck. The recovery of the pipeline was completed without incident and on schedule. The DLB BIG CHIEF is currently engaged in additional pipelay projects in the western gulf.
Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Del Mar Signs Agency Agreement with Ciramar

Del Mar Marine Corp. announced it has signed an agency agreement with Ciramar Shipyards allowing the company to promote Ciramar Shipyard´s docking and facilities

Bouchard Orders Two Newbuild ATB Tugs

Morton S. Bouchard III, President and CEO of Bouchard Transportation Co., Inc., today announced the next step in Bouchard Transportation Co., Inc.’s ongoing fleet

Great Lakes Shipyard Wins EPA Drydock Contract

Great Lakes Shipyard has been awarded a contract for the United States Environmental Protection Agency (EPA) vessel R/V Lake Explorer II. The scope of work will include drydocking,

Salvage

Salvage Crews Avert Disaster in the Galápagos

Mammoet Salvage helps avert environmental disaster in the Galápagos Islands Mammoet Salvage and its partner, CPT Remolcadores SA of Chile, recently responded

Family Finds Sunken Treasure Off Florida Coast

A Florida family scavenging for sunken treasure on a shipwreck has found the missing piece of a 300-year-old gold filigree necklace sacred to Spanish priests, officials said on Tuesday.

Grounded Freighter Refloated in Lake St. Clair

The Federal Rideau, a 656-foot freighter that had been hard aground in the downbound shipping channel of Lake St. Clair since early Sunday morning, was refloated

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2486 sec (4 req/sec)