Damaged Pipeline Recovered

Thursday, August 18, 2005
Upon completion of the second successful pipelay, 22,000’ x 6” in the Ship Shoal area, BISSO MARINE pipeline division reconfigured the DLB BIG CHIEF to recover 14,000’ of 20” pipeline in the Main Pass area. The 20” pipeline, which was crossed by three trunklines, had been uncovered, kinked and moved about during Hurricane Ivan, leaving the line in a condition which prevented any opportunity to pig the pipeline prior to the removal. Due to the pipeline being “hot”, BISSO MARINE devised a plan to pull the pipeline onto the barge’s “recovery line”, purge and cold cut. The cut piece of pipeline was then encapsulated and placed onto the materials barge for transport to a facility for cleaning and disposal. The customization of the DLB BIG CHIEF included the fabrication of a large pollution containment area; a heavy duty frame to support the hydraulic cutting machine and heavy wall pipe rollers to support the pipeline while on deck. The recovery of the pipeline was completed without incident and on schedule. The DLB BIG CHIEF is currently engaged in additional pipelay projects in the western gulf.
Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Mitsubishi to Build Diesel Oil Import Terminal in Australia

Japanese trading house Mitsubishi Corp said it is entering Australia's diesel market by building a $103 million gas oil import terminal to tap growing demand and

Volvo Penta Offer D4, D6 Series Engine Keel Cooling Option

Volvo Penta of the Americas has announced the availability of a keel cooling option with D4 and D6 marine diesel engines to meet customer demands in the North American marine commercial market.

Boscalis to Get IJsseldelta 'Room for the River' Contract

Royal Boskalis Westminster N.V. (Boskalis) say that the Dutch Department of Public Works and the province of Overijssel intends to award the contract for the IJsseldelta polder to them.

Salvage

GMS Establishes New Headquarters

Gallagher Marine Systems LLC (GMS) announced today that it has established a new headquarters in Moorestown, New Jersey for its North American operations in a move

Treasure Hauled from SS Central America Shipwreck

Odyssey Recovers Over 13,500 Silver and Gold Coins as Well as Gold Ingots, Dust, Nuggets and Jewelry From SS Central America Shipwreck; Newly Released Inventory

Mexico Tries to Relaunch Stranded North Korean Ship

Mexican rescue workers were trying to refloat a North Korean vessel stranded in the Gulf of Mexico a few miles from a port where it had planned to load fertilizer, authorities said on Tuesday.

 
 
Maritime Contracts Maritime Standards Naval Architecture Navigation Pod Propulsion Port Authority Ship Electronics Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1258 sec (8 req/sec)