Coast Guard to Assess Matagorda Ship Channel for LNGs

Wednesday, April 12, 2006
The U.S. Coast Guard Sector Corpus Christi will assess safety and security issues associated with liquefied natural gas tankers traveling in the Matagorda Ship Channel in order to make a recommendation to the Federal Energy Regulatory Commission (FERC) regarding Calhoun LNG, L.P.'s proposal to build a liquefied natural gas terminal in Calhoun County. The Coast Guard received official notification of Calhoun LNG, L.P.'s plans on March 14, 2005. "We plan to work very closely with local officials, members of our Harbor Safety Committee and the Area Maritime Security Committee in evaluating this proposal," said Captain Jake Korn, Coast Guard Captain of the Port at Sector Corpus Christi. "We will also be looking for comments from the general public to ensure we have considered the full range of issues associated with moving LNG tankers on the Matagorda Ship Channel." FERC is responsible for authorizing the siting, construction, and operation of onshore LNG facilities. Upon receiving an application for an LNG facility, FERC is required to complete an Environmental Impact Statement (EIS), evaluating issues ranging from air quality and biological impacts, to cultural and socioeconomic impacts, to safety and security impacts. The Coast Guard will serve as a cooperating agency for FERC's EIS. Calhoun LNG, L.P. has provided the Coast Guard with a preliminary safety and security assessment that identifies navigational safety hazards as well as potential security threats, along with recommended mitigation measures and the resources (federal, state, local and private sector) that will be needed to provide an acceptable level of safety and security for the proposed LNG operations. This assessment has been submitted to the Coast Guard so that it can be reviewed and validated by key stakeholders at the port, including members of the Area Maritime Security Committee. Based on this assessment, the Coast Guard Captain of the Port will evaluate the suitability of the waterway for LNG marine traffic and provide his findings to FERC for inclusion in its EIS.
Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Star Clippers to Build Massive Square Rigger

Tall ship sailing specialist Star Clippers has announced that it has started building a fourth ship to add to its fleet of graceful square-riggers; its first new-build

Mercury Diesel Engines for 16 New USCG Boats

Mercury Marine has entered an agreement with Metal Shark Aluminum Boats to power 16 U.S. Coast Guard (USCG) boats with Mercury diesel engines.   “Mercury Marine’s 2.

HHI Launches Korea’s Second Minelayer

Shipbuilder Hyundai Heavy Industries (HHI) launched the second minelayer, MLS-II Nampo, for the Korean Navy.   In attendance at the MLS-II launching ceremony were Baek Seung-joo,

LNG

Hoegh LNG Bags FSRU Deal in Chile

Oslo-based Höegh LNG said it has signed an Floating Storage and Regasification Unit (FSRU)contract with Chilean Octopus LNG for the Penco-Lirquén LNG import terminal to be located in Concepción Bay,

CNPC Eyes Myanmar for LNG Terminal

China's biggest oil and gas company China National Petroleum Corp.(CNPC ) has expressed interested in  a terminal in Kyaukphyu in Myanmar  to receive imported Liquefied natural gas (LNG).

Natural Gas Articulated Conduit System Patented

Elliott Bay Design Group (EBDG) announced that long-time partner Moran Towing Corporation has been granted US Patent 8,967,174 for "Articulated conduit systems

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Port Authority Salvage Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1226 sec (8 req/sec)