Grounded MSC Napoli to be Refloated

Monday, July 09, 2007
According to reports, work will begin on Monday to refloat the container vessel MSC Napoli six months after it ran aground off the Devon coast, the Maritime & Coastguard Agency said.

Engineers will aim to pump out 58,000 tons of water during the next three days in an attempt to prevent it breaking up and damaging the environment.

A barge with winches and cranes, along with tugs and an anti-pollution vessel are at sea to help in the operation.

More than two thousand containers and 3,000 tons of fuel oil have already been removed from the vessel which was deliberately beached off Branscome in January to prevent it sinking after being holed during storms. About 200 containers fell off and some reached the shore, sparking a looting spree.

It should take six hours to remove the water, but salvagers need three days of good weather to get the shipwreck in a holding position before deciding what to do next. The decision to refloat the vessel was taken by Robin Middleton, the secretary of state's representative in maritime salvage and intervention, after reviewing the condition of the ship and the prevailing weather conditions in Lyme Bay.

Source: Reuters

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Globecomm to Provide VSAT for PBJV Barge

Purpose-built accommodation and pipe-lay barge on charter to Petronas equipped with VSAT and L-Band services. Globecomm Maritime has been awarded a contract

VSTEP Wins Mexican Navy Simulator Contract

The Mexican Navy selected VSTEP to supply a Class A NAUTIS Full Mission Bridge (FMB) Simulator and 24 NAUTIS desktop trainer stations for the Naval Academy in Veracruz.

Floating Production: $1.2b Speculative FLNG Ordered

The floating production business continues to be very strong, particularly in the LNG gas processing sector.  Last month saw a speculatively ordered floating liquefaction plant – a $1.

Salvage

Grounded Freighter Refloated in Lake St. Clair

The Federal Rideau, a 656-foot freighter that had been hard aground in the downbound shipping channel of Lake St. Clair since early Sunday morning, was refloated

S.Korea Ferry Boss's Driver Turns Self In

The driver of a South Korean businessman wanted over the sinking of a ferry that killed 304 people turned himself in on Tuesday, potentially unlocking the mystery

Lake St. Clair Grounded Bulk Carrier: Update

The U.S. Coast Guard said it continues to monitor the response and salvage operations to the 656-foot HK-flagged bulk carrier Federal Rideau, hard aground in the downbound shipping channel of Lake St.

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1132 sec (9 req/sec)