Smit Reports Growth

Monday, August 20, 2007
In the first half of 2007 the Division won two major long-term contracts. A 25-year contract will be carried out in a joint venture involving the provision of 4 tugs for an LNG terminal in Italy. This contract will start contributing in the second half of 2008. In addition, a long-term contract was acquired in Angola. This contract will start contributing towards the end of 2007. Part of the activities in Gabon, which were carried out with an (aged) river fleet, were divested. The sale of these activities generated one-time income of EUR 1.4 million after deducting reorganisation costs. Against this, the result of the Terminals Division includes a one-time expense of approximately EUR 1.0 million in relation to employee benefits in Nigeria. A new contract was started in Equatorial Guinea. This concerns the deployment of two tugs for an LNG terminal. The growth target for the net profit is 50% over a 5-year period (starting in 2003).

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter June 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

This Day In Naval History: June 29

1860 - The steamer USS Mystic, commanded by William E. LeRoy, captures the slaver, Thomas Achorn at Kabenda, Africa and send her to New York.    1862 - During the Civil War,

Fundraiser Held for USS Gerald R. Ford Crew

Blackmer, a company in positive displacement and centrifugal pump and reciprocating compressor technologies, has a relationship with the U.S. Military that dates

Russia, US Blame Each Other for Maritime Incident

Russia and the United States gave contradictory accounts on Tuesday of an incident involving the two countries' navies in the Mediterranean Sea on June 17, each

Salvage

Williamson Named GM of Donjon-Smit

Donjon-Smit, LLC, an OPA-90 Alliance, announced that after a recent Board of Directors meeting Tim Williamson has been promoted to General Manager of Donjon-Smit,

Waterway Reopened after Barge Grounding

The U.S. Coast Guard has opened the Red River from mile marker 40 to mile marker 42 for vessel traffic, Monday.   The Red River had been closed due to a barge that had run aground at mile marker 41,

Red River Closed after Barge Grounding

The Red River was closed Sunday from mile marker 40 to mile marker 42, after a barge reportedly ran aground and was protruding into the channel near mile marker 41, according to the U.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Offshore Oil Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0661 sec (15 req/sec)