Smit Reports Growth

Monday, August 20, 2007
In the first half of 2007 the Division won two major long-term contracts. A 25-year contract will be carried out in a joint venture involving the provision of 4 tugs for an LNG terminal in Italy. This contract will start contributing in the second half of 2008. In addition, a long-term contract was acquired in Angola. This contract will start contributing towards the end of 2007. Part of the activities in Gabon, which were carried out with an (aged) river fleet, were divested. The sale of these activities generated one-time income of EUR 1.4 million after deducting reorganisation costs. Against this, the result of the Terminals Division includes a one-time expense of approximately EUR 1.0 million in relation to employee benefits in Nigeria. A new contract was started in Equatorial Guinea. This concerns the deployment of two tugs for an LNG terminal. The growth target for the net profit is 50% over a 5-year period (starting in 2003).

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

BWTS Refit for Netherlands Naval Vessels

The Defense Material Organization has awarded three contracts to Goltens Worldwide’s Green Technologies business unit for the engineering and turnkey installation

Seaspan Responds to Canada’s NSS Announcement

In response to the Government of Canada’s announcement of a series of enhancements to strengthen the National Shipbuilding Strategy, Seaspan Shipyards’ president

This Day In Naval History: May 26

1943 - USS Saury (SS 189) attacks a Japanese convoy south of Kyushu and sinks transport Kagi Maru, about 10 miles north of the Nansei Shoto. Also on this date,

Salvage

Returning to the Scene of the Shipwrecks

A participant in a diving field school last fall, graduate student Tori Kiefer is back to help a new set of students learn the joy of surveying shipwrecks.   Last fall,

Grounded Bulker Repaired, Heads for Japan

The Captain of the Port for Oregon and southern Washington canceled the captain of the port order on the motor vessel Sparna allowing the vessel to leave its mooring at Kalama, Wash.

Ardent Earns ISO 9001:2015 Certification

Ardent, formed just over a year ago as a merger of A.P. Moller-Maersk’s Svitzer Salvage and Crowley’s Titan Salvage, has been issued the ISO 9001:2015 Certification

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Pipelines Pod Propulsion Salvage Ship Electronics Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1203 sec (8 req/sec)