Catamaran Survey Vessel Delivered to Global Geophysical Services

Wednesday, April 25, 2007
The 140 ft. catamaran seismic survey vessel Ms. Cordelia was delivered to Global Geophysical Services, Houston, TX. The all aluminum vessel was converted from a prototype high speed low wake passenger ferry that had not been completed or put in service. The conversion design and engineering was done by the naval architectural firm of Guarino & Cox, LLC, Covington, LA. Seacraft Shipyard carried out the conversion work at their facilities in Amelia, LA.

The unfinished vessel was considered an ideal candidate to be converted for its intended use primarily due to the large deck area available and its shallow draft. The MS. CORDELIA will be capable of performing inshore shallow water seismic survey work laying and retrieving cables in as little as 6 feet of water.

The slender catamaran demi-hulls make the vessel extremely fuel efficient at a continuous cruising speed of 12 knots and comfortable in the short steep waves often found in inshore locations. The major modification to the hull form was the removal of the large water jets originally installed and altering the stern lines to utilize conventional propellers in shallow tunnels. A continuous maximum speed of 15 knots is obtained through this arrangement with power provided by two new 700shp Lugger diesel main engines engines.

An operating speed of 2 to 3 knots was a requirement during deployment and retrieval of the special cables used while surveying. This would normally be impossible to achieve with the easily driven catamaran form but the naval architects of Guarino & Cox devised a scheme using oversized independent rudders capable of being splayed outboard up to 60 degrees that deflect the propeller wash and act as water brakes.

Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

LNG

Davie Building LNG-powered Ferries

Canadian shipbuilder Davie held a keel laying ceremony for MV Armand-Imbeau II, marking the beginning of the hull assembly for this first of two sisterships under

ClassNK Updates Guidelines for Floating Offshore Facilities

ClassNK released a new version of its Guidelines for Floating Offshore Facilities for LNG/LPG Production, Storage, Offloading and Regasification.   Available on the ClassNK website,

Lithuania Looks to U.S. for Gas

Lithuanian liquefied natural gas (LNG) importer Litgas has signed a preliminary agreement with a U.S. supplier, looking to lessen the Baltic nation's dependence on Russia.

 
 
Maritime Contracts Maritime Standards Navigation Pipelines Port Authority Salvage Ship Electronics Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.3844 sec (3 req/sec)