New Anti-Fouling System from Cathelco

Friday, March 13, 2009

Cathelco has launched a new system which is specifically designed to protect box coolers against bio-fouling caused by barnacles and mussels.

Although Cathelco has protected box coolers in the past, this is the first time it has produced a system using anodes which are completely submerged instead of being inserted through the side of the seachest.

In the new design the anode is mounted horizontally beneath the cooling tubes and has cathode plates on either side to create a more even distribution of copper ions over the entire surface area. The ions create an environment where mussel and barnacle larvae do not settle or grow, avoiding the problems which are caused when they multiply and become encrusted on the cooling tubes. This reduces the efficiency of the heat transfer process resulting in engines overheating and increased fuel usage.

A purpose built mounting unit has been designed to hold the anode horizontally in direct line with the seawater flowing from the inlet to the cooling tubes.  A cable exit boss is supplied by Cathelco with double watertight cable glands to produce an effective seal.

In common with Cathelco’s existing equipment, the box cooler system is based on the electrolytic principle where current is supplied to the anode from a control panel.

The first vessel to be installed with the new box cooler system is the Venus, an 282 ft (l.o.a) car ferry operated by the Swedish Road Administration on the short crossing between Svanesund and Kolhattan.

The system protects two seachests each containing four box coolers using two Cathelco anode units mounted beneath each cooler. The installation work was carried out by Marinprodukter, Cathelco’s Swedish agent.

(www.cathelco.com)

Maritime Reporter February 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

New Products

SSI Launches ShipConstructor 2015 R2.1

SSI has today released ShipConstructor 2015 R2.1 software.   The software release comes in response to emerging ship design, engineering and building trends as

Imabari to Construct Newbuilding Dry Dock

In order to accommodate construction of Ultra-Large newbuilding vessels including recently secured 20,000TEU Mega container ships (about 400m in length and about 59m breadth),

Long Beach Port to Boost Power, Speed Clearance

Port of Long Beach Chief Executive Jon Slangerup on Thursday unveiled ambitious plans for congestion-beating smart systems for cargo movement and an all-out

 
 
Maritime Security Maritime Standards Offshore Oil Pipelines Pod Propulsion Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1354 sec (7 req/sec)