Port of Cleveland to Address Critical Problems

Press Release
Tuesday, March 12, 2013

The Port is leading critical intitiatives for river renewal and infrastructure improvements.

In cooperation with the City of Cleveland, the Port is taking a lead role in solving a set of connected and critical environmental and infrastructure problems  on the river that have vexed the community for years, as follows:

•    Managing sediment dredged annually from the river. Enough sediment is scooped out annually to fill a sports stadium – and then deposited in what are essentially landfills along the lake. But experience and scientific analysis has shown that sediment is a resource that can be used to benefit the community. We are leading efforts to develop the mechanisms and market to make that happen.
    •    Repairing or replacing bulkheads that line the ship channel. Research indicates that bulkheads do not exist or are in poor condition along 29,000 feet of the channel. Fixes are crucial to protect shipping and set the stage for more job-creating and recreational developments. We believe this problem can be tackled with leadership and creativity.
    •    Stabilizing the Irishtown Bend hillside to stop its slow but relentless slide into the river. Ancient geologic problems well below the surface have caused the gradual slide. Working with scientists at universities and in the private sector, we believe we can develop options to remake the hillside in a way that allows for both riverfront access and construction of a stretch of the proposed multi-purpose trail connecting the Towpath to Wendy Park on the lakefront.
    •    Environmental restoration initiatives along the river. The Port is launching a vessel system to remove floating debris from the ship channel and downtown lakefront, and aims to work closely with the U.S. Environmental Protection Agency to address the cleanup of contaminated sediments that rest on the bottom of the Old River Channel. Both initiatives are part of community efforts to restore the river, which drew national attention and spurred new federal environmental legislation after catching fire in 1969. The aim is that by 2019 – the 50th anniversary of the fire – the river will be largely restored, with nearly all the impairments that had been identified by the U.S. EPA resolved.

The Port states that its aim is to not only fix the problems, but develop solutions that benefit the people who work, live and play along the Cuyahoga River, as well as the wildlife that depend on its marine habitats.





 

Maritime Reporter July 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

KEP Marine Unveils KMGBL

KEP Marine – the manufacturer of type approved displays, computers and peripherals, announced  the release of the affordable, high-quality KMGBL Glass Bridge Light Displays.

New Load Measurement Solution for Port of Dampier

Strainstall designs and delivers a load measurement solution for the world’s largest floating wharf at Port of Dampier.   Strainstall, part of James Fisher and Sons plc,

Rolls-Royce Power Package for USS Zumwalt

Rolls-Royce announced delivery of the twin fixed pitch propellers to Bath Iron Works for installation on the U.S. Navy’s most modern surface combatant, the future USS Zumwalt,

Ports

Diesel Spill in Houston Ship Channel

A small section of the Upper Houston Ship Channel was closed Tuesday morning after a report of 1,000 gallons of diesel entered Greens Bayou from a cement facility, the U.

New Load Measurement Solution for Port of Dampier

Strainstall designs and delivers a load measurement solution for the world’s largest floating wharf at Port of Dampier.   Strainstall, part of James Fisher and Sons plc,

Work Begins on $1.6 bln Container Terminal at Jebel Ali Port

DP World Chairman Sultan Ahmed Bin Sulayem announced the start of construction work on a brand new container terminal at Jebel Ali Port, Dubai.   Phase 1 of the

Navigation

Egypt to Allow 24-hour Access to East Port Said with New Waterway

Egypt plans to allow smaller vessels in the Mediterranean direct access to East Port Said around the clock instead of just eight hours a day by building a side channel near the Suez Canal,

Diesel Spill in Houston Ship Channel

A small section of the Upper Houston Ship Channel was closed Tuesday morning after a report of 1,000 gallons of diesel entered Greens Bayou from a cement facility, the U.

KEP Marine Unveils KMGBL

KEP Marine – the manufacturer of type approved displays, computers and peripherals, announced  the release of the affordable, high-quality KMGBL Glass Bridge Light Displays.

Environmental

Self-lubricating Bearing Polymer: Safe, Easy to Machine

Many plastics and metallic alloys present machining challenges as some deform and are difficult to maintain exacting tolerances, while others require strict and

Diesel Spill in Houston Ship Channel

A small section of the Upper Houston Ship Channel was closed Tuesday morning after a report of 1,000 gallons of diesel entered Greens Bayou from a cement facility, the U.

New Load Measurement Solution for Port of Dampier

Strainstall designs and delivers a load measurement solution for the world’s largest floating wharf at Port of Dampier.   Strainstall, part of James Fisher and Sons plc,

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Offshore Oil Pipelines Pod Propulsion Ship Electronics Ship Repair Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1574 sec (6 req/sec)