FERC Drafts EIS on Freeport LNG Project

MarineLink.com
Monday, March 17, 2014
Image: Freeport LNG

FERC issues draft Environmental Impact Statement on the Phase II Modification and Liquefaction Projects (CP12-29-000 and CP12-509-000)



The staff of the Federal Energy Regulatory Commission (FERC) has prepared a draft environmental impact statement (EIS) for the Phase II Modification Project and the Liquefaction Project. The Projects are proposed by Freeport LNG and are located in Brazoria County near the city of Freeport, Texas. The proposed Phase II Modification Project includes: modification to the previously authorized liquefied natural gas (LNG) vessel berthing dock, LNG transfer pipelines, LNG unloading arms, and the access road system at Freeport LNG’s existing Quintana Island terminal. Freeport LNG would not construct components of the previously authorized facility, including vaporization equipment that was approved to increase the LNG Terminal's sendout capacity.



The proposed Liquefaction Project consists of the Liquefaction Plant at and adjacent to the existing Quintana Island LNG terminal and would provide Freeport LNG the capacity to export about 13.2 million tons of LNG per year. Freeport would install 3 liquefaction trains and supporting equipment capable of liquefying 1.8 billion cubic feet of natural gas per day.



In support of the Liquefaction Plant, Freeport LNG proposes to construct a natural gas Pretreatment Plant about 2.5 miles north of the existing Quintana Island terminal. The Pretreatment Plant would process the gas for liquefaction. In addition, several interconnecting pipelines and utility lines would run from the Quintana Island terminal to the Pretreatment Plant.



The draft EIS was prepared in compliance with the requirements of the National Environmental Policy Act (NEPA), the Council on Environmental Quality regulations for implementing NEPA (40 Code of Federal Regulations [CFR] 1500–1508), and FERC regulations implementing NEPA (18 CFR 380). The U.S. Army Corps of Engineers, U.S. Department of Energy, United States Environmental Protection Agency, the U.S. Department of Transportation, and the National Oceanic and Atmospheric Administration - National Marine Fisheries Service cooperated in the preparation of the draft EIS.


The draft EIS assesses the potential environmental effects of the construction and operation of the Projects in accordance with the requirements of NEPA. We conclude that construction and operation of the Projects would result in adverse impacts on certain resources and nearby communities. We have identified that there would be significant and unavoidable impacts on residents of the town of Quintana due to construction noise and construction traffic if the Projects are approved by the Commission. However, other adverse impacts would be reduced to less-than-significant levels with the implementation of Freeport LNG’s mitigation measures and the additional measures we recommend in the EIS.


Although many factors were considered in this determination, the principal reasons are:

  • the site of the Liquefaction Plant would be an expansion of an existing, operating LNG import terminal with existing LNG storage tanks and berthing and loading/unloading facilities;
  • Freeport LNG would implement its dredging plan to minimize impacts of in-water dredging, implement the use of Freeport’s Procedures and specialized construction techniques to minimize construction impacts on soils, wetlands, and waterbodies;
  • Freeport LNG would incorporate adequate safety features into the design and operation of the Projects;
  • the Pipeline/Utility Line System follows the existing sendout pipeline and would be contained within the already disturbed right-of-way;
  • the Projects would have no effect or would not likely adversely affect any federally-listed or state-listed threatened or endangered species;
  • air emissions from the Projects would not exceed of the National Ambient Air Quality Standards, and noise and vibration impacts would be minimized; and
  • the FERC’s environmental and engineering inspection and mitigation monitoring program for this Project would ensure compliance with all mitigation measures and conditions of any FERC Authorization.



Any person wishing to comment on the draft EIS may do so. To ensure consideration of comments on the proposal in the final EIS, it is important that the commission receive comments on or before May 5, 2014.

 

Maritime Reporter September 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Environmental

Fortum Buys Stake in Wave Power Startup

Finland's top utility, state-controlled Fortum, on Monday said it has acquired a 14 percent stake in Finnish wave energy developer Wello. Wello has developed

Cavernous Swiss Power Plant Undermined by Renewable Energy

Deep in a Swiss mountain, workers have blasted out a cathedral-sized hole for a power plant that will help keep Europe's lights on, but the profit outlook for the 1.

China's National Carbon Market to Start in 2016

China plans to roll out its national market for carbon permit trading in 2016, an official said Sunday, adding that the government is close to finalising rules

Energy

Fortum Buys Stake in Wave Power Startup

Finland's top utility, state-controlled Fortum, on Monday said it has acquired a 14 percent stake in Finnish wave energy developer Wello. Wello has developed

Gazprom Neft Starts Oil Production, Shipments from Iraqi Badra Field

Russia's Gazprom Neft said on Monday it started commercial production and shipments of oil produced at its Iraqi Badra oil field. Gazprom Neft, the oil arm of state gas company Gazprom ,

Statoil Says Normal Operations at In Amenas Gas Plant Resuming

Normal operations are resuming at the In Amenas gas plant in Algeria 18 months after a raid by Islamist militants killed forty employees, one of the plant's operators, Statoil, said on Monday.

News

Fortum Buys Stake in Wave Power Startup

Finland's top utility, state-controlled Fortum, on Monday said it has acquired a 14 percent stake in Finnish wave energy developer Wello. Wello has developed

Gazprom Neft Starts Oil Production, Shipments from Iraqi Badra Field

Russia's Gazprom Neft said on Monday it started commercial production and shipments of oil produced at its Iraqi Badra oil field. Gazprom Neft, the oil arm of state gas company Gazprom ,

Statoil Says Normal Operations at In Amenas Gas Plant Resuming

Normal operations are resuming at the In Amenas gas plant in Algeria 18 months after a raid by Islamist militants killed forty employees, one of the plant's operators, Statoil, said on Monday.

Government Update

FTA Approves WSF Ferry Terminal Plans

In the latest Washington State Ferries Weekly Update, Capt. George A. Capacci, Interim Assistant Secretary WSDOT/Ferries Division briefs as follows: "FTA approves

DoD Award Dredging, Ship Maintenance, Charter Contracts

US Department of Defense informs of placement of contracts for Chesapeake Bay dredging, dry-docking of USS Pearl Harbor, and charter of surface escort vessels. Details as follows: 1.

Indian Investigators Drop Case Against Billionaire Birla

India's Central Bureau of Investigation (CBI) has closed a coal scam case against billionaire Kumar Mangalam Birla and a former top bureaucrat that emerged in

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Naval Architecture Pod Propulsion Port Authority Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1710 sec (6 req/sec)