Tome Choose Intergraph® Solutions for FPSO Topsides

Press Release
Wednesday, March 20, 2013

Brazilian joint venture will use SmartMarine® Enterprise components for project with oil giant Petrobras.

Tome Ferrostaal, a joint venture between Tome Engenharia and Ferrostaal in Brazil, has selected Intergraph® SmartMarine® Enterprise solutions, distributed by Sisgraph, as part of a project with Petrobras, one of the world's largest energy companies. Intergraph's enterprise engineering software will be used to construct the topsides of six identical floating, production, storage and offloading (FPSO) vessels, which will be built in Brazil.

Sisgraph, based in Sao Paulo, Brazil, has been a distributor of Intergraph solutions in South America for more than 30 years. Intergraph and Sisgraph are part of Hexagon.

Tome Ferrostaal will use these leading-edge Intergraph enterprise engineering solutions for the construction of the topsides: SmartMarine 3D, SmartPlant P&ID, SmartPlant Instrumentation, SmartPlant Electrical, SmartPlant Review, CAESAR II® and PV Elite®. In addition to the software, Sisgraph will provide training and on-site support for the project.

"By using the Intergraph technology solutions distributed by Sisgraph, we expect to boost productivity and project quality, and also to reduce project time and errors, especially by having on-site technical support," said Sergio Miranda , automation systems coordinator at Tome Ferrostaal.

Gerhard Sallinger , Intergraph Process, Power & Marine president, said, "This is the first major offshore project for Tome Ferrostaal, and in choosing Intergraph as its technology provider, Tome Ferrostaal reinforces our leading position in the Brazilian offshore market. For this important project, Tome Ferrostaal recognizes the safety, quality and productivity benefits that our enterprise solutions offer."

Intergraph say that their SmartMarine Enterprise suite is the world's most advanced, integrated offshore and shipbuilding solution, driving improvements in design efficiency, production schedule, handover, and overall life-cycle cost control for enhanced global competitiveness. Intergraph is a world leader in marine structure design and data management, with SmartMarine Enterprise endorsed and used by the world's leading offshore and marine companies, including the most productive shipyard, the top offshore owner operator, the top fabrication yard, and the top classification society in the world.
 

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

Newport News Lays Keel for Virginia-Class Sub

Newport News Shipbuilding, a division of Huntington Ingalls Industries (HII), hosted a keel-laying ceremony Saturday for the future USS Washington (SSN 787), a

World’s Largest Containership First Tested at MARIN

MARIN was delighted to take part in a truly historic milestone in the industry when Daewoo Shipbuilding and Marine Engineering (DSME) asked MARIN to investigate

Is Glycerine the Next Marine Fuel?

Following a year described as “intense activity,” the Glycerine Fuel for Marine Sustainability project (GLEAMS) concluded that Glycerine is a viable, exceptionally clean alternative marine fuel.

Contracts

Fire Departments Choose Sea-Fire Systems

Metalcraft Marine's Firestorm high-speed, aluminum fireboat represents a new generation in vessel technology, especially when fitted with Sea-Fire H Series engineered fire suppression systems.

Russian Liftings for Western Options at 12-Year Low

By Gleb Gorodyankin MOSCOW, Nov 25 (Reuters) - Exports of Russian crude oil to Western markets are set to fall by almost a third in December and reach a 12-year

Overwhelming Support for ‘Hit the HMT Target!’

Today, the American Association of Port Authorities (AAPA) applauded a “Dear Colleague” letter to the leadership of the Senate Committee on Appropriations that was signed by 22 senators,

Offshore

Pile Testing for Wikinger Wind Farm Launched

In October 2014 the first phase of the pile testing campaign for the Wikinger offshore wind farm project was launched after the site’s geotechnical investigation on the Baltic Sea had been completed.

Damen, Palfinger Upgrade North Sea Jack-Up Rig

With the support of Palfinger systems JUMP technology, Damen Shiprepair Vlissingen has completed an upgrade of a Keppel Fels ‘N’ Class drilling rig, one of the largest in the North Sea,

Vietnam Warship Visits Underscore Regional Tension

Vietnam on Tuesday showed off its two most powerful warships in the first-ever port call to the Philippines but an official said it was not trying to challenge

CAD/CAM

SENER Presents at SNAME Convention

SENER presents the module for the ship General Arrangement definition in FORAN SENER took part once again in the Annual Society of Naval Architects and Marine Engineers (SNAME) Convention in the U.

Offshore Energy

Pile Testing for Wikinger Wind Farm Launched

In October 2014 the first phase of the pile testing campaign for the Wikinger offshore wind farm project was launched after the site’s geotechnical investigation on the Baltic Sea had been completed.

Damen, Palfinger Upgrade North Sea Jack-Up Rig

With the support of Palfinger systems JUMP technology, Damen Shiprepair Vlissingen has completed an upgrade of a Keppel Fels ‘N’ Class drilling rig, one of the largest in the North Sea,

Vietnam Warship Visits Underscore Regional Tension

Vietnam on Tuesday showed off its two most powerful warships in the first-ever port call to the Philippines but an official said it was not trying to challenge

 
 
Maritime Security Naval Architecture Offshore Oil Pod Propulsion Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1305 sec (8 req/sec)