Jensen to Design LNG Bunker Barges

Posted by Eric Haun
Monday, February 24, 2014
Image: Jensen Marine

Houston-based LNG fuel supply and distribution company LNG America LLC announced today that it has contracted Jensen Maritime, Crowley Maritime Corp.'s Seattle-based naval architecture and marine engineering company, to design the initial bunker/shuttle barge for its U.S. Gulf Coast operations.

Currently no LNG bunkering barges are in operation in American waterways, and these vessels will be among the first to be developed and built, marking a significant step in LNG America’s build-out of LNG bunkering infrastructure along the U.S. Gulf Coast and in delivering a new clean fuel to the maritime industry.

The vessels, which are expected to be delivered and ready for service in late 2015, have an initial planned capacity of up to 3,000 cubic meters of LNG.  Once in operation, the bunker barges will serve the dual purpose of moving LNG from the supply source to coastal-based storage and distribution terminals as well as directly bunkering large ships.   

“Through LNG America’s LNG bunkering initiative, we plan to serve and facilitate the growing marine demand for LNG,” said Keith Meyer, CEO of LNG America. “LNG America sees the demand for marine LNG to be robust as long as LNG can be made available to the maritime industry on a reliable, dependable and cost-competitive basis. Our mission is to deliver competitively priced LNG as fuel where needed, when needed and in the quantity needed.”

“The significance of this agreement is not only incredible news for the marine industry, which struggles with whether to develop LNG infrastructure or vessels first, but also for companies along the U.S. Gulf that hope to replace their traditional vessels with cleaner, more efficient LNG-powered ones,” said Jensen’s Johan Sperling, vice president. “We are thrilled to be working with LNG America in the development of its marine infrastructure and also in providing a green fuel source to this important region. Jensen is on the leading edge when it comes to LNG vessel design and we look forward to serving LNG America and other customers with this valuable service.”

Jensen first produced prototype designs for LNG vessels in 2008. Additionally, Jensen has developed designs for a 100’ x 40’ LNG tugboat and is currently working on several other prototype designs of LNG bunker vessels, harbor tugs, ATBs, container ships and tankers, along with inland vessels for a variety of customers in the U.S.

LNG America was formed last July to develop LNG distribution infrastructure that serves not only the marine market but the burgeoning use of LNG in the oil and gas, rail, mining and heavy-duty trucking markets as well.  These markets have emerged due to the fuel’s price competitiveness resulting from the abundant U.S. natural gas reserves.

jensenmaritime.com

lngamerica.com

Jensen Maritime will design vessels to supply maritime industry with clean fuel source and build LNG infrastructure along U.S. Gulf Coast
 

  • Image: Jensen Marine

    Image: Jensen Marine

Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Energy

Oceans Can’t Take Any more: Researchers Fear Fundamental Change

Our oceans need an immediate and substantial reduction of anthropogenic greenhouse gas emissions. If that doesn’t happen, we could see far-reaching and largely

Teekay LNG Partners Declares Distribution

Teekay GP LLC, the general partner of Teekay LNG Partners L.P. has declared a cash distribution of $0.70 per unit for the quarter ended June 30, 2015. The cash distribution is payable on August 14,

Technip Samsung JV Wins 2 FLNG Project Contracts

The Browse project covers the realization and installation of three FLNG units to develop the Brecknock, Calliance and Torosa fields in the Browse Basin, 425 kilometers North of Broome,

LNG

Teekay LNG Partners Declares Distribution

Teekay GP LLC, the general partner of Teekay LNG Partners L.P. has declared a cash distribution of $0.70 per unit for the quarter ended June 30, 2015. The cash distribution is payable on August 14,

Technip Samsung JV Wins 2 FLNG Project Contracts

The Browse project covers the realization and installation of three FLNG units to develop the Brecknock, Calliance and Torosa fields in the Browse Basin, 425 kilometers North of Broome,

Litgas, Statoil JV to Develop Baltic Sea LNG

Natural gas supply and trading company Litgas, part of Lithuania's state owned energy holding Lietuvos Energija, and Statoil, leading global energy company in oil and gas production,

Naval Architecture

Technip Samsung JV Wins 2 FLNG Project Contracts

The Browse project covers the realization and installation of three FLNG units to develop the Brecknock, Calliance and Torosa fields in the Browse Basin, 425 kilometers North of Broome,

SAFE Boats Bags Homeland Security Order

Production of Customs and Border Protection’s coastal interceptor vessels to commence immediately   SAFE Boats International informs it has been awarded a contract from U.

Ardmore Shipping Takes Tanker Delivery

Ardmore Shipping Corporation took delivery of the newbuild product and chemical tanker vessel Ardmore Seafox on June 25, 2015, the company announced today. The 49,

News

New Binding Law of The Sea Agreement Advanced

WOC Sustainable Ocean Summit (Singapore, 9-11 November 2015) Will Enable Industry to Organize its Input to this Major New Ocean Treaty Development The U.N.

Oceans Can’t Take Any more: Researchers Fear Fundamental Change

Our oceans need an immediate and substantial reduction of anthropogenic greenhouse gas emissions. If that doesn’t happen, we could see far-reaching and largely

Teekay LNG Partners Declares Distribution

Teekay GP LLC, the general partner of Teekay LNG Partners L.P. has declared a cash distribution of $0.70 per unit for the quarter ended June 30, 2015. The cash distribution is payable on August 14,

Barges

Carlyle Group Acquires LMC

Global alternative asset manager The Carlyle Group today announced the acquisition of Lauderdale Marine Center (LMC), the nation's largest yacht repair facility

Propulsion Under Wireless Remote Control

Thrustmaster of Texas, Inc. has been supplying wireless remote controls for thrusters since the 1980s, offering products that are supported through their lifecycles

ContainerTug B.V. Releases Two New Models

Young Dutch ship design, engineering and construction company ContainerTug B.V. follows on the introduction of the ContainerTug 600S early last year with the release

 
 
Maritime Contracts Maritime Security Maritime Standards Navigation Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1833 sec (5 req/sec)