St. Lawrence Seaway Notices Update

Posted by Eric Haun
Monday, April 14, 2014
courtesy Great Lakes St. Lawrence Seaway

The Great lakes St. Lawrence Seaway System today issued notices number nine and 10 regarding maximum allowable drafts in the Montreal section in Lake Ontario and revocation of certain transit restrictions.

Seaway notice 9 addresses maximum allowable drafts in Lake Ontario’s Montreal section, stating the maximum allowable draft is increased to 80.8 dm (26' 06"), subject to favorable water elevations, effective April 14, 2014. This increase applies to all vessels. In addition, there will be zero tolerance for ship's draft in excess of 80.8 dm (26' 6"). Speeds will be monitored carefully between St. Lambert Lock and St. Nicolas Island for ships loaded to a draft greater than 80.0 dm (26' 3").

Notice 10 states transit restrictions at opening (draft and power to length ratio) outlined in Seaway notice number two of 2014 no longer apply. Notice number two initially limited certain transit areas due to ice conditions, but is revoked with notice 10.

Seaway notices address issues specific to a given navigation season, and serve to complement the regulations found in the Seaway Handbook. The notices (which take the form of general Seaway notices applicable to the entire St. Lawrence Seaway, and regional notices which may be applicable to the Montreal / Lake Ontario region or to the Welland Canal) are disseminated via e-mail broadcasts to subscribers.

greatlakes-seaway.com
 

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Environmental

‘Green’ Hybrid-powered Research Vessel Christened

The Maritime Aquarium at Norwalk christened a larger, “greener” new research vessel on Friday, September 26 in preparation for launching a new era in examining,

Cove Point LNG Export Facility Gets US FERC Approval

U.S. federal regulators on Monday approved construction of Dominion Resources Inc's liquefied natural gas export project in Cove Point, Maryland. Cove Point is the fourth U.

Shipping's GHG Emissions Down

The total Green House Gas (GHG) emissions from global maritime transport are estimated to have been over 20% lower in 2012 than in 2007, according to "London Matters

News

Kounalakis Joins OW Bunker N. America

OW Bunker, a reseller and physical supplier of marine fuels, announced the appointment of Georgia Kounalakis to its physical supply operation in North America.

Louisiana to Get Natural Gas Liquefaction and Fueling Facility

Tenaska Bayou LNG expected to meet growing marine, transportation and oil and gas exploration and production demand on the Gulf Coast Tenaska NG Fuels, LLC and Waller Marine, Inc.

New Simulation Tool for Collision Reconstruction

BMT ARGOSS and BMT Surveys, subsidiaries of BMT Group Ltd, the international design, engineering and risk management consultancy, announced an innovative new service

Great Lakes

Great Lakes Restoration Plan Announced

U.S. Environmental Protection Agency (EPA) informs that Administrator Gina McCarthy has released a new Great Lakes Restoration Initiative (GLRI) Action Plan that

Intermodal Short Sea Barge Operation Completed

The Great Lakes Towing Company completed an Intermodal Short Sea barge move utilizing the Port of Cleveland’s Rail Loop and the Port’s switching line, Cleveland Harbor Belt Railroad.

The Great Lakes Ballast Water Challenge Explained

Skuld P&I Club in a members advisory explores the regulatory framework and practical issues that exist in both Canada and the USA with input from BLG of Montreal and Chalos & Co of New York.

 
 
Maritime Contracts Naval Architecture Navigation Pod Propulsion Port Authority Salvage Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2341 sec (4 req/sec)