USCG Marine Safety Alert 05-12

Office of Commercial Vessel Compliance, Washington, DC
Monday, December 31, 2012

Pressure Switch Location for Fixed Fire Suppression Systems Where's yours located?

 

This safety alert addresses the location of fire suppression system pressure switches aboard vessels. These critical components sense the activation of the system and then electrically secures the ventilation systems operating in the protected space.  Securing the ventilation is essential in extinguishing a fire onboard a vessel. It assists in isolating the fire within the space, minimizes the introduction of additional oxygen to fuel the fire and prevents the loss of fire suppression agents from the space.

 

Recently, a vessel with an installed fixed CO2 fire suppression system, suffered extensive damage due to a fire that started in the engine room. During the firefighting efforts the crew reported that the engine room ventilation could not be secured.  A post casualty damage survey of the vessel revealed that the pressure switch used to secure the ventilation was located within the engine room. See the photograph of the damaged pressure switch at the right and new switch below.

 

Fixed CO2 systems on inspected/regulated vessels need to be type approved and installed in accordance with applicable regulations; 46 CFR 25.30-15, 46 CFR Subpart 76.15, 46 CFR Subpart 95.15, 46 CFR 118.410, etc.  These regulations require all controls and valves for the operation of the system to be outside the space protected, and notes they cannot be located in any space that might be cut off or made inaccessible in the event of fire in the protected spaces.  The Coast Guard considers pressure switches that are used in such systems a "control."

 

For Uninspected Towing Vessels, 46 CFR 25.30-15 (b) requires installation in accordance with 46 CFR Subpart 76.15 and reiterates the location requirements.

 

The Coast Guard strongly reminds Owners and Operators of vessels with installed fixed fire suppression systems to ensure that these switches are properly located aboard their vessels.  If the pressure switch or switches are located within the space being protected, they should be relocated by a properly trained fire suppression service technician.  Doing so will assist in ensuring system functionality and accessibility in the event of an emergency.  Failing to do so could have serious consequences to the vessel, its crew and the environment.


This safety alert is for informational purposes only and does not relieve any domestic or international safety, operational or material requirement. Developed by the Office of Commercial Vessel Compliance, Washington, DC.

Maritime Reporter July 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Equipment

Optimized Tug-Barge System Designs by Robert Allan

Optimized Tug-Barge System Designs by Robert Allan Ltd. by David R. Connand Robert G. Allan, P.Eng. Some veteran Mississippi pushboats and barges have been

Thordon Bearings Secures AK Ferry Contract

Thordon Bearings has received an order to supply its COMPAC system to two Alaska Ferry newbuilds under construction at the Vigor Industrial shipyard in Ketchikan, Alaska.

UK Navy Chooses Effer Crane Again

Cranes manufacturer Effer informs its marine crane has recently been installed aboard the U.K. Royal Navy’s patrol vessel HMS Mersey.   The new 5s 275M crane,

Coast Guard

On USCG Anniversary, Gov. McAuliffe Urges Hurricane Preparedness

Gov. Terry McAuliffe encouraged Virginians to get ready for hurricane season and provided an update on the commonwealth’s preparations Friday at a press conference

DHS, Postal Service to Dedicate USCG Forever Stamp

U.S. Department of Homeland Security (DHS) and Postal Service leaders are scheduled to dedicate the United States Coast Guard Forever stamp during a ceremony Tuesday at Coast Guard Headquarters.

Three Rescued on Lake Tahoe

The Coast Guard and multiple agencies rescued three people Wednesday evening after they were reported missing on Lake Tahoe. At 9:45 p.m., Coast Guard Sector

Maritime Safety

On USCG Anniversary, Gov. McAuliffe Urges Hurricane Preparedness

Gov. Terry McAuliffe encouraged Virginians to get ready for hurricane season and provided an update on the commonwealth’s preparations Friday at a press conference

South China Sea Hotline in the Works

China and Southeast Asian nations have agreed to set up a foreign ministers' hotline to tackle emergencies in the disputed South China Sea, a senior official of

Three Rescued on Lake Tahoe

The Coast Guard and multiple agencies rescued three people Wednesday evening after they were reported missing on Lake Tahoe. At 9:45 p.m., Coast Guard Sector

Government Update

Thordon Bearings Secures AK Ferry Contract

Thordon Bearings has received an order to supply its COMPAC system to two Alaska Ferry newbuilds under construction at the Vigor Industrial shipyard in Ketchikan, Alaska.

West Africa's August Crude Exports to Asia to Slip

West African crude oil exports to Asia were expected to fall to 1.84 million barrels per day (bpd) in August, Reuters data and a survey of traders showed.     Slower

DHS, Postal Service to Dedicate USCG Forever Stamp

U.S. Department of Homeland Security (DHS) and Postal Service leaders are scheduled to dedicate the United States Coast Guard Forever stamp during a ceremony Tuesday at Coast Guard Headquarters.

 
 
Maritime Contracts Naval Architecture Navigation Offshore Oil Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2075 sec (5 req/sec)